Laserfiche WebLink
4 of 12 <br /> Supplemental Agreement No. 1 <br />d. It is assumed that the majority of the project will be disturbed because of urban <br />development and will just require disturbance assessment, and the area of the <br />detention basin appears to have been the location of a baseball field complex and no <br />more than 30 STPs will be required. It is also anticipated that no archaeological sites <br />will be recorded and that only an Archaeological Short Report (ASR) will be required <br />for reporting the results. <br />e. The Phase Ia ASR will summarize results of the literature review, will document results <br />of fieldwork, and provide a summary of the natural and cultural setting of the project <br />area. <br />f. If a site is located, artifacts collected during the survey will be taken to the laboratory <br />for processing and analysis. Following artifact analysis, the CONSULTANT will prepare <br />a full archaeological report that meets INDOT standards. This report will summarize <br />the results of the literature review, document the results of fieldwork, and provide a <br />summary of the natural and cultural setting of the project area. Finally, the report will <br />provide management recommendations regarding archaeological sites identified <br />during the survey. <br />g. Notes, photographs, documentation, and artifacts will be curated at an accredited <br />curatorial facility, such as the Indiana State Museum, pending donation by the <br />landowner. Artifacts and notes will be processed to meet the standard for permanent <br />storage at the accredited curatorial facility. If no sites are identified, the CONSULTANT <br />will retain the project documentation at their offices for a standard 5 years. <br />h. Archaeological Phase 1b, 1c, Phase II, or Phase III Investigations or any tasks associated <br />with the discovery of human remains are not included. <br />i. Subconsultant services will be required all or part of this scope item. <br /> <br />XII. Revise Section O and O.1 in Appendix “A”, as follows: <br /> <br />The CONSULTANT shall make or cause to be made, a complete roadway geotechnical <br />investigation to be in accordance with the Geotechnical Manual, INDOT Materials and Tests <br />Division, 2016 Edition, of which a copy is on file with the Indiana Department of Transportation <br />and same is incorporated herein by reference and is made a part hereof. The Geotechnical <br />investigation shall include up to 7 8 roadway borings to a depth of 15 feet and up to 2 3 borings <br />to a depth of 25 feet for proposed traffic signals and proposed basin location. Location of the <br />borings are to be determined. <br /> <br />1. An allowance of $29,600.00 $35,800.00 has been included for the CONSULTANT and/or <br />SUBCONSULTANT to perform Geotechnical Investigation services, as directed and <br />described below. <br /> <br />XIII. Add item 3 to Appendix “A”, Section O, as follows: <br /> <br />3. A percolation test will occur on the proposed basin site. The LPA will make attempts at <br />contacting the property owner prior to the CONSULTANT performing or causing this work <br />to be performed. <br /> <br />