Laserfiche WebLink
2 of 12 <br /> Supplemental Agreement No. 1 <br />III. Revise Appendix “A” Section B.1.l., as follows: <br /> <br />Alignments will be established along Bendix Drive from north of Lathrop Street to south of Voorde <br />Drive (total length of 4500 feet) and along Lathrop Street and Voorde Drive (total length of 800 <br />1,350 feet). <br /> <br />IV. Revise Appendix “A” Section E.2, as follows: <br /> <br />Lathrop Street and Voorde Drive approaches to Bendix Drive will only be reconstructed as far back <br />as necessary to transition from their existing configuration to the proposed Bendix Drive layout. <br />Voorde Drive will be reconstructed as far back as necessary to provide the necessary storm <br />sewer outlet to the proposed basin location, up to approximately 850 feet. <br /> <br />V. Revise Appendix “A” Section E.5.b, as follows: <br /> <br />The LPA shall provide the outfall location for the proposed storm sewer network. A basin will be <br />sized and located on Parcel 018-2184-6938, which will be the outfall location for the proposed <br />storm sewer network. The basin will be designed without an outlet or overflow, and sized in <br />accordance with the City of South Bend Design and Construction Standards, dated June 26, 2018. <br />In addition to the basin being sized for this project, an additional capacity will be estimated for <br />collecting the stormwater for the remaining portion of Bendix Road up to Lincolnway West. This <br />is a future project and the basin capacity will be confirmed at that time. <br /> <br />VI. Delete and replace Appendix “A” Section E.9, as follows: <br /> <br />9. The LPA is considered a Certified LPA; therefore, formal submittal of preliminary plan <br />milestones to INDOT is not required. The plans and supporting design documents will be <br />submitted as follows: <br />a. Stage 1, Preliminary Field Check (PFC), and Stage 3 plans will be submitted to the LPA <br />for review. <br />Final Tracings, calculations, and supporting documentation in accordance with IDM <br />Chapter 14 will be submitted to INDOT. <br /> <br /> <br />VII. Delete Appendix “A” Section E.10 in its entirety. <br /> <br /> <br />VIII. Delete Appendix “A” Section F.5 in its entirety . <br /> <br /> <br />IX. Delete Appendix “A” Section G.3 in its entirety. <br /> <br /> <br />X. Delete Appendix “A” Section H.3 in its entirety. <br /> <br /> <br />