Laserfiche WebLink
9 of 12 <br /> Supplemental Agreement No. 1 <br />XVII. Revise Appendix ā€œDā€, Sections A.1 and A.2, as follows: <br /> <br />A. Amount of Payment <br />1. The CONSULTANT shall receive as payment for the work performed under this Agreement the <br />total fee not to exceed $777,110.00 $1,048,050.00 unless a modification of this agreement is <br />approved in writing by the LPA. <br />2. The CONSULTANT will be paid for the work performed under Appendix ā€œAā€ of this Agreement <br />on a Lump Sum basis in accordance with the following schedule, except as noted in the items <br />below: <br /> <br />Task Description Amount <br />A. Project Management $59,300.00 <br />B. Topographic Field Survey $50,100.00 <br />$56,600.00 <br />C. Location Control Route Survey Plat (LCRSP) $8,900.00 <br />D. Subsurface Utility Engineering (Allowance)* $65,700.00 <br />E. Roadway Design Plans (Preliminary Plans) $323,010.00 <br />$453,600.00 <br />F. Water Main and Sanitary Sewer Design (Preliminary Plans) $39,800.00 <br />$79,600.00 <br />G. Traffic Signal Design at Voorde Drive and Bendix Drive (Preliminary Plans) $9,000.00 <br />$20,200.00 <br />H. Traffic Signal Design at Lathrop Street and Bendix Drive (Preliminary Plans) $9,000.00 <br />$22,700.00 <br />I. Pavement Design $7,300.00 <br />J. Environmental Document Preparation (NEPA) $23,100.00 <br />$34,400.00 <br />K. Waters of the US Determination Report $6,700.00 <br />L. Public Information/Design Hearing Meeting (Hourly Rate) $17,400.00 <br />M. Airport and Railroad Coordination (Allowance)* $18,400.00 <br />N. Utility Coordination $21,800.00 <br />O. Geotechnical Investigation (Allowance)* $29,600.00 <br />$35,800.00 <br /> P. Right of Way Engineering Services** <br /> <br />$50,600.00 <br />$35,950.00 <br /> <br />1. Title Abstracting (Est. 20 13 Tax IDs @ $550.00 ea.) = $11,000.00 $7,150.00 <br />2. Right of Way Engineering & Plans (Est. 11 8 Parcels @ $3,100.00 ea.) = <br />$34,100.00 $24,800.00 <br />3. Right of Way Staking (Est. 11 8 Parcels @ $500.00 ea.) = $5,500.00 $4,000.00 <br />Q. Right of Way Acquisition Services*** <br />$37,400.00 <br />$27,200.00 <br /> 1. Right of Way Early Assessment (11 8 @ Est. $140.00 ea.) = $1,540.00 $1,120.00 <br /> 2. Appraisal Problem Analysis (11 8 @ Est. $260.00) = $2,860.00 $2,080.00 <br /> 3. Appraisal Services (11 8 @ Est. $2,000.00) = $22,000.00 $16,000.00 <br /> 4. Appraisal Review Services (11 8 @ Est. $1,000.00) = $11,000.00 $8,000.00 <br />R. Existing Sewer System Evaluation and Televising $7,300.00 <br />S. Traffic Signal Timing Optimization $6,600.00 <br />T. Permitting $8,600.00 <br />U. Bid and Construction Phase Office Services $54,000.00 <br /> <br />Total = <br />$777,110.00 <br />$1,048,050. <br />00