Laserfiche WebLink
<br /> <br /> <br />INTER-OFFICE MEMORANDUM <br /> <br /> DEPARTMENT OF PUBLIC WORKS <br /> DIVISION OF ENVIRONMENTAL SERVICES <br /> <br /> <br />TO: Members of the Board of Public Works <br />Michael Schmidt, Assistant City Attorney Public Works <br />Theresa Heffner, Clerk of the Board of Public Works <br />FROM: Jacob M. Klosinski, P.E., Assistant City Engineer <br />SUBJECT: 123-031A WWTP Degrit Building Yard Piping Replacement <br />(PROJ00000435) <br />Agenda Request – Title Sheet & Request to Advertise <br />DATE: January 16, 2024 <br /> <br />The Divisions of Engineering and Wastewater request that the Board of Public Works approve a <br />Title Sheet and Request to Advertise for Public Bids for Project No. 123-031 WWTP Degrit Building <br />Yard Piping Replacement at its Regular Meeting on January 23, 2024. This is the first letting of two <br />scheduled projects for improvements in this area of the Wastewater Treatment Plant. The first <br />project addresses Yard Piping. The second project will replace the DAF Units with gravity belt <br />thickeners. <br /> <br />Project Background <br /> <br />The existing Primary Sludge and Waste Activated Sludge yard piping will be replaced between the <br />Compressor Building #5 basement and the Degrit Building #6 basement. Concrete sidewalk, <br />asphalt pavement, concrete stairs and handrail will also be replaced as required to expose and <br />replace the yard piping between the buildings and existing tanks in this area of the Wastewater <br />Treatment Plant. The 30+ year old sludge piping has experienced multiple breaks and repairs over <br />the last three years, and the section loss of the pipe has slowly deteriorated due to the abrasive <br />nature of the grit and solids that carry through the primary sludge and waste activated sludge <br />piping. New, Protecto 401 interior coated ceramic lined ductile iron pipe will be installed to replace <br />the existing cement lined ductile iron pipe. <br /> <br />Public Bid Schedule <br /> <br />Advertisement 1: January 26, 2024 <br />Advertisement 2: February 2, 2024 <br />Pre-Bid Meeting: February 8, 2024 <br />Bid Opening: February 27, 2024 <br />Bid Award (tentative): March 12, 2024 <br /> <br />The Plans and Specifications are in final revisions and will be ready prior to the first <br />advertisement on Friday, January 26, 2024. The Purchase Requisition is being added to DFO <br />the afternoon of January 16, 2024. <br /> <br />Funding for this project is directed out of the Sewage Works Capital – Wastewater Capital, <br />Account 642-06-605-514-442005. For questions regarding the subject agenda request, contact <br />Jacob M. Klosinski (Ext. 9496) at the Division of Engineering.