Laserfiche WebLink
Aviftiflos,F <br />The Road To Success is Always Under Construction' <br />24963 US 20 West <br />South Bend, Indiana, 46628 <br />Phone: 574 287-2078 <br />Fax.• 574 287-1744 <br />1nn=# <br />ildlhke <br />Single Mobile Lane Closure <br />1-8HRS: $475.00 Per <br />Operation, Hourly Rate, South <br />Hour <br />Bend, IN- Consists OF: <br />8HRS+: $712.50 Per <br />3 EA- Construction Sign, A <br />Hour <br />15 EA- Drums <br />1 EA- Arrow Board <br />1 Laborer & Truck, Hourly Rate.'4 <br />Hour Minimum Charge' ouA <br />Rate Is Cha ed Based On T' e <br />Worked On -Site From rt/Finlsh. <br />Drive Time Is Not Chaff <br />AddWona1Da161RentafMems, If <br />Neeoted <br />Drums, DaiiyRental, If Needed <br />$1.25Per Day, Each <br />Construction Sign, A, Daily Rental, <br />$5.50 Per Day, Each <br />lfNeeded <br />Arrow Boards, Daily Rental, N <br />$50.00 Per Day, Each <br />Needed <br />Da#y Rental Enjoinent To Be <br />Picked Ug FronvReturned To SB/ <br />Yard By Geoore h Industries Inc. <br />Quote <br />Bate:12111/YOYS <br />Job South Bend <br />Slynage Project, Phase <br />8. South land, V:. <br />11Tst� <br />