BID TABULATION #123-013
<br />Sob Ta EF
<br />#123-013 Wayfinding Signage Program Phase 3
<br />e
<br />'sbs x BASE BID
<br />Engineer's Estimate I Geograph Industries, Inc.
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />1
<br />MOBILIZATION/DEMOBILIZATION
<br />1
<br />LSUM
<br />$ 12,000.00
<br />$ 12,000.00
<br />$ 4,025.00
<br />$ 4,025.00
<br />2
<br />COMMON EXCAVATION, UNDISTRIBUTED
<br />38
<br />LSUM
<br />$ 50.00
<br />$ 1,900.00
<br />$ 288.00
<br />$ 10,944.00
<br />3
<br />Gx-1, VEHICULAR GUIDE 6" SIGN ASSEMBLY
<br />3
<br />LSUM
<br />$ 6,500.00
<br />$ 19,500.00
<br />$ 9,315.00
<br />$ 27,945.00
<br />4
<br />CONCRETE FOUNDATION W/ BREAKAWAY (2 PER SIGN)
<br />6
<br />LSUM
<br />INCIDENTAL
<br />$ -
<br />INCIDENTAL
<br />$ -
<br />5
<br />Gx-3, VEHICULAR GUIDE 4" SIGN ASSEMBLY
<br />8
<br />LSUM
<br />$ 7,600.00
<br />$ 60,800.00
<br />$ 7,800.00
<br />$ 62,400.00
<br />6
<br />SIGN POLE FOUNDATION
<br />8
<br />LSUM
<br />INCIDENTAL
<br />$ -
<br />INCIDENTAL
<br />$ -
<br />7
<br />Gx-5, VEHICULAR TRAILBLAZER SIGN (ON EXISTING POLE)
<br />1
<br />CYS
<br />$ 2,250.00
<br />$ 2,250.00
<br />$ 2,007.00
<br />$ 2,007.00
<br />8
<br />Gx-5a VEHICULAR TRAILBLAZER SIGN (SIGN ONLY)
<br />1
<br />SYS
<br />$ 1,600.00
<br />$ 1,600.00
<br />$ 1,550.00
<br />$ 1,550.00
<br />9
<br />EXISTING SIGN AND FOUNDATION REMOVAL
<br />2
<br />SYS
<br />$ 100.00
<br />$ 200.00
<br />$ 1,480.00
<br />$ 2,960.00
<br />10
<br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY
<br />2
<br />LIFT
<br />$ 18,500.00
<br />$ 37,000.00
<br />$ 17,035.00
<br />$ 34,070.00
<br />BASE BID TOTAL
<br />$ 135,250.00
<br />$ 145,901.00
<br />ALTERNATE #1 - McKINLEY GATEWAY SIGN
<br />Engineer's Estimate
<br />Contractor
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />1.1
<br />EXISTING SIGN AND FOUNDATION REMOVAL
<br />1
<br />LS
<br />$ 1,000.00
<br />$ 1,000.00
<br />$ 1,380.00
<br />$ 1,380.00
<br />2.1
<br />COMMON EXCAVATION, UNDISTRIBUTED
<br />4
<br />CYS
<br />$ 50.00
<br />$ 200.00
<br />$ 288.00
<br />$ 1,152.00
<br />3.1
<br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY
<br />1
<br />EACH
<br />$ 18,500.00
<br />$ 18,500.00
<br />$ 17,035.00
<br />$ 17,035.00
<br />ALTERNATE #1 TOTAL
<br />$ 19,700.00
<br />$ 19,567.00
<br />ALTERNATE #2 - WESTERN GATEWAY SIGN
<br />Engineer's Estimate
<br />Contractor
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />1.2
<br />EXISTING SIGN AND FOUNDATION REMOVAL
<br />1
<br />LS
<br />$ 1,000.00
<br />$ 1,000.00
<br />$ 1,380.00
<br />$ 1,380.00
<br />2.2
<br />COMMON EXCAVATION, UNDISTRIBUTED
<br />4
<br />CYS
<br />$ 50.00
<br />$ 200.00
<br />$ 288.00
<br />$ 1,152.00
<br />3.2
<br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY
<br />1
<br />EACH
<br />$ 18,500.00
<br />$ 18,500.00
<br />$ 17,035.00
<br />$ 17,035.00
<br />ALTERNATE #2 TOTAL
<br />$ 19,700.00
<br />$ 19,567.00
<br />ALTERNATE #3 - S.R.23 GATEWAY SIGN
<br />Engineer's Estimate
<br />Contractor
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />1.3
<br />COMMON EXCAVATION, UNDISTRIBUTED
<br />4
<br />CYS
<br />$ 50.00
<br />$ 200.00
<br />$ 288.00
<br />$ 1,152.00
<br />2.3
<br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY
<br />1
<br />EACH
<br />$ 18,500.00
<br />$ 18,500.00
<br />$ 17,035.00
<br />$ 17,035.00
<br />ALTERNATE #3 TOTAL
<br />$ 18,700.00
<br />$ 18,187.00
<br />ALTERNATE #4 - SOLAR POWER SIGN LIGHTS FOR GATEWAYS IN BASE BID I Engineer's Estimate I Contractor
<br />Item No.
<br />I Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />I Cost
<br />I Unit Price
<br />I Cost
<br />1.4
<br />ISOLAR POWERED SIGN LIGHT
<br />3
<br />EACH
<br />$ 6,600.00
<br />$ 19,800.00
<br />$ 90.00
<br />$ 270.00
<br />TERNATE #4 TOTAL
<br />ALTERNATE #5 - SOLAR POWER SIGN LIGHTS FOR GATEWAYS IN ALTERNATES
<br />19, 800.00
<br />Engineer's Estimate I Contractor
<br />270.00
<br />Item No.
<br />I Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />I Cost
<br />Unit Price
<br />I Cost
<br />1.5
<br />ISOLAR POWERED SIGN LIGHT
<br />3
<br />EACH
<br />$ 6,600.00
<br />$ 19,800.00
<br />1 $ 90.00
<br />Is 270.00
<br />FERNATE #5 TOTAL
<br />ALTERNATE #6 - IRONWOOD SIGN 36
<br />19,800.00
<br />Engineer's Estimate I Contractor
<br />270.00
<br />Item No.
<br />Line Item
<br />Quantity
<br />Unit
<br />Unit Price
<br />Cost
<br />Unit Price
<br />Cost
<br />1.6
<br />Gx-5a VEHICULAR TRAILBLAZER SIGN (ON 2" SQUARE POST)
<br />1
<br />EACH
<br />$ 1,900.00
<br />$ 1,900.00
<br />Is 1,550.00
<br />1 $ 1,550.00
<br />ALTERNATE #6 TOTAL I I$ 1,900.00 1 1$ 1,550.00 1
<br />BASE BID TOTAL
<br />$ 145,901.00
<br />ALTERNATE #1 TOTAL
<br />$ 19,567.00
<br />ALTERNATE #2 TOTAL
<br />$ 19,567.00
<br />ALTERNATE #3 TOTAL
<br />$ 18,187.00
<br />ALTERNATE #4 TOTAL
<br />$ 270.00
<br />ALTERNATE #5 TOTAL
<br />$ 270.00
<br />ALTERNATE #6 TOTAL
<br />$ 1,550.00
<br />TOTAL PROJECT COST 205,312.00
<br />Engineer's Estimate Contractor
<br />Non -Collusion Affidavit YES
<br />Bid Bond I I YES
<br />Responsible Bidder Documentation & Letter I I YES
<br />MWBE Goals Met YES
<br />MWBE Good Faith Effort YES
<br />It appears that Geograph at least attempted to find a minority business with 3 listed as
<br />contacted, however did find a woman owned.
<br />I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023
<br />"--e 00W41A_
<br />Austin Blomeke, Landscape Architect
<br />a �•• \sr
<br />RFo .
<br />N0.f
<br />• : LA22200037 •
<br />r'. STATE OF 1 ti
<br />�///mcgPE ARC ��
<br />H:\2019 Projects\2019-0230\Bidding\323-013JPR Bid Tabulation 2023-12-12
<br />
|