BID TABULATION #123-013
<br />#123-013 Wayfinding Signage Program Phase 3
<br />BASE BID
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1 MOBILIZATION/DEMOBILIZATION 1 LSUM $ 12,000.00 $ 12,000.00 $ 4,025.00 $ 4,025.00
<br />2 COMMON EXCAVATION, UNDISTRIBUTED 38 LSUM $50.00 $ 1,900.00 $288.00 $ 10,944.00
<br />3 Gx-1, VEHICULAR GUIDE 6" SIGN ASSEMBLY 3 LSUM $ 6,500.00 $ 19,500.00 $ 9,315.00 $ 27,945.00
<br />4 CONCRETE FOUNDATION W/ BREAKAWAY (2 PER SIGN)6 LSUM INCIDENTAL $- INCIDENTAL $-
<br />5 Gx-3, VEHICULAR GUIDE 4" SIGN ASSEMBLY 8 LSUM $ 7,600.00 $ 60,800.00 $ 7,800.00 $ 62,400.00
<br />6 SIGN POLE FOUNDATION 8 LSUM INCIDENTAL $- INCIDENTAL $-
<br />7 Gx-5, VEHICULAR TRAILBLAZER SIGN (ON EXISTING POLE)1 CYS $ 2,250.00 $ 2,250.00 $ 2,007.00 $ 2,007.00
<br />8 Gx-5a VEHICULAR TRAILBLAZER SIGN (SIGN ONLY)1 SYS $ 1,600.00 $ 1,600.00 $ 1,550.00 $ 1,550.00
<br />9 EXISTING SIGN AND FOUNDATION REMOVAL 2 SYS $100.00 $200.00 $ 1,480.00 $ 2,960.00
<br />10 I-1 PRIMARY GATEWAY SIGN ASSEMBLY 2 LFT $ 18,500.00 $ 37,000.00 $ 17,035.00 $ 34,070.00
<br />BASE BID TOTAL $ 135,250.00 $ 145,901.00
<br />ALTERNATE #1 - McKINLEY GATEWAY SIGN
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1.1 EXISTING SIGN AND FOUNDATION REMOVAL 1 LS $ 1,000.00 $ 1,000.00 $ 1,380.00 $ 1,380.00
<br />2.1 COMMON EXCAVATION, UNDISTRIBUTED 4 CYS $50.00 $200.00 $288.00 $ 1,152.00
<br />3.1 I-1 PRIMARY GATEWAY SIGN ASSEMBLY 1 EACH $ 18,500.00 $ 18,500.00 $ 17,035.00 $ 17,035.00
<br />ALTERNATE #1 TOTAL $ 19,700.00 $ 19,567.00
<br />ALTERNATE #2 - WESTERN GATEWAY SIGN
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1.2 EXISTING SIGN AND FOUNDATION REMOVAL 1 LS $ 1,000.00 $ 1,000.00 $ 1,380.00 $ 1,380.00
<br />2.2 COMMON EXCAVATION, UNDISTRIBUTED 4 CYS $50.00 $200.00 $288.00 $ 1,152.00
<br />3.2 I-1 PRIMARY GATEWAY SIGN ASSEMBLY 1 EACH $ 18,500.00 $ 18,500.00 $ 17,035.00 $ 17,035.00
<br />ALTERNATE #2 TOTAL $ 19,700.00 $ 19,567.00
<br />ALTERNATE #3 - S.R.23 GATEWAY SIGN
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1.3 COMMON EXCAVATION, UNDISTRIBUTED 4 CYS $50.00 $200.00 $288.00 $ 1,152.00
<br />2.3 I-1 PRIMARY GATEWAY SIGN ASSEMBLY 1 EACH $ 18,500.00 $ 18,500.00 $ 17,035.00 $ 17,035.00
<br />ALTERNATE #3 TOTAL $ 18,700.00 $ 18,187.00
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1.4 SOLAR POWERED SIGN LIGHT 3 EACH $ 6,600.00 $ 19,800.00 $90.00 $270.00
<br />ALTERNATE #4 TOTAL $ 19,800.00 $270.00
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1.5 SOLAR POWERED SIGN LIGHT 3 EACH $ 6,600.00 $ 19,800.00 $90.00 $270.00
<br />ALTERNATE #5 TOTAL $ 19,800.00 $270.00
<br />Item No. Line Item Quantity Unit Unit Price Cost Unit Price Cost
<br />1.6 Gx-5a VEHICULAR TRAILBLAZER SIGN (ON 2" SQUARE POST)1 EACH $ 1,900.00 $ 1,900.00 $ 1,550.00 $ 1,550.00
<br />ALTERNATE #6 TOTAL $ 1,900.00 $ 1,550.00
<br />I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023
<br />Austin Blomeke, Landscape Architect
<br />It appears that Geograph at least attempted to find a minority business with 3 listed as
<br />contacted, however did find a woman owned.
<br /> $19,567.00
<br /> $18,187.00
<br /> $270.00
<br /> $270.00
<br /> $1,550.00
<br />ALTERNATE #2 TOTAL
<br />ALTERNATE #6 TOTAL
<br />ALTERNATE #5 TOTAL
<br />ALTERNATE #4 TOTAL
<br />ALTERNATE #3 TOTAL
<br />Non-Collusion Affidavit YES
<br />ALTERNATE #4 - SOLAR POWER SIGN LIGHTS FOR GATEWAYS IN BASE BID
<br />ALTERNATE #5 - SOLAR POWER SIGN LIGHTS FOR GATEWAYS IN ALTERNATES Engineer's Estimate Contractor
<br />ALTERNATE #6 - IRONWOOD SIGN 36 Engineer's Estimate Contractor
<br />Engineer's Estimate Geograph Industries, Inc.
<br />Contractor
<br />Engineer's Estimate Contractor
<br />Engineer's Estimate Contractor
<br />Engineer's Estimate Contractor
<br />Engineer's Estimate
<br />Engineer's Estimate Contractor
<br />BASE BID TOTAL
<br />ALTERNATE #1 TOTAL
<br /> $145,901.00
<br /> $19,567.00
<br />TOTAL PROJECT COST $205,312.00
<br />MWBE Goals Met YES
<br />MWBE Good Faith Effort YES
<br />Responsible Bidder Documentation & Letter YES
<br />Bid Bond YES
<br />H:\2019 Projects\2019-0210\Bidding\123-013 JPR Bid Tabulation 2023-12-12
|