Laserfiche WebLink
BID TABULATION #123-013 <br />Sob Ta EF <br />#123-013 Wayfinding Signage Program Phase 3 <br />e <br />'sbs x BASE BID <br />Engineer's Estimate I Geograph Industries, Inc. <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1 <br />MOBILIZATION/DEMOBILIZATION <br />1 <br />LSUM <br />$ 12,000.00 <br />$ 12,000.00 <br />$ 4,025.00 <br />$ 4,025.00 <br />2 <br />COMMON EXCAVATION, UNDISTRIBUTED <br />38 <br />LSUM <br />$ 50.00 <br />$ 1,900.00 <br />$ 288.00 <br />$ 10,944.00 <br />3 <br />Gx-1, VEHICULAR GUIDE 6" SIGN ASSEMBLY <br />3 <br />LSUM <br />$ 6,500.00 <br />$ 19,500.00 <br />$ 9,315.00 <br />$ 27,945.00 <br />4 <br />CONCRETE FOUNDATION W/ BREAKAWAY (2 PER SIGN) <br />6 <br />LSUM <br />INCIDENTAL <br />$ - <br />INCIDENTAL <br />$ - <br />5 <br />Gx-3, VEHICULAR GUIDE 4" SIGN ASSEMBLY <br />8 <br />LSUM <br />$ 7,600.00 <br />$ 60,800.00 <br />$ 7,800.00 <br />$ 62,400.00 <br />6 <br />SIGN POLE FOUNDATION <br />8 <br />LSUM <br />INCIDENTAL <br />$ - <br />INCIDENTAL <br />$ - <br />7 <br />Gx-5, VEHICULAR TRAILBLAZER SIGN (ON EXISTING POLE) <br />1 <br />CYS <br />$ 2,250.00 <br />$ 2,250.00 <br />$ 2,007.00 <br />$ 2,007.00 <br />8 <br />Gx-5a VEHICULAR TRAILBLAZER SIGN (SIGN ONLY) <br />1 <br />SYS <br />$ 1,600.00 <br />$ 1,600.00 <br />$ 1,550.00 <br />$ 1,550.00 <br />9 <br />EXISTING SIGN AND FOUNDATION REMOVAL <br />2 <br />SYS <br />$ 100.00 <br />$ 200.00 <br />$ 1,480.00 <br />$ 2,960.00 <br />10 <br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY <br />2 <br />LIFT <br />$ 18,500.00 <br />$ 37,000.00 <br />$ 17,035.00 <br />$ 34,070.00 <br />BASE BID TOTAL <br />$ 135,250.00 <br />$ 145,901.00 <br />ALTERNATE #1 - McKINLEY GATEWAY SIGN <br />Engineer's Estimate <br />Contractor <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1.1 <br />EXISTING SIGN AND FOUNDATION REMOVAL <br />1 <br />LS <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,380.00 <br />$ 1,380.00 <br />2.1 <br />COMMON EXCAVATION, UNDISTRIBUTED <br />4 <br />CYS <br />$ 50.00 <br />$ 200.00 <br />$ 288.00 <br />$ 1,152.00 <br />3.1 <br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY <br />1 <br />EACH <br />$ 18,500.00 <br />$ 18,500.00 <br />$ 17,035.00 <br />$ 17,035.00 <br />ALTERNATE #1 TOTAL <br />$ 19,700.00 <br />$ 19,567.00 <br />ALTERNATE #2 - WESTERN GATEWAY SIGN <br />Engineer's Estimate <br />Contractor <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1.2 <br />EXISTING SIGN AND FOUNDATION REMOVAL <br />1 <br />LS <br />$ 1,000.00 <br />$ 1,000.00 <br />$ 1,380.00 <br />$ 1,380.00 <br />2.2 <br />COMMON EXCAVATION, UNDISTRIBUTED <br />4 <br />CYS <br />$ 50.00 <br />$ 200.00 <br />$ 288.00 <br />$ 1,152.00 <br />3.2 <br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY <br />1 <br />EACH <br />$ 18,500.00 <br />$ 18,500.00 <br />$ 17,035.00 <br />$ 17,035.00 <br />ALTERNATE #2 TOTAL <br />$ 19,700.00 <br />$ 19,567.00 <br />ALTERNATE #3 - S.R.23 GATEWAY SIGN <br />Engineer's Estimate <br />Contractor <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1.3 <br />COMMON EXCAVATION, UNDISTRIBUTED <br />4 <br />CYS <br />$ 50.00 <br />$ 200.00 <br />$ 288.00 <br />$ 1,152.00 <br />2.3 <br />1-1 PRIMARY GATEWAY SIGN ASSEMBLY <br />1 <br />EACH <br />$ 18,500.00 <br />$ 18,500.00 <br />$ 17,035.00 <br />$ 17,035.00 <br />ALTERNATE #3 TOTAL <br />$ 18,700.00 <br />$ 18,187.00 <br />ALTERNATE #4 - SOLAR POWER SIGN LIGHTS FOR GATEWAYS IN BASE BID I Engineer's Estimate I Contractor <br />Item No. <br />I Line Item <br />Quantity <br />Unit <br />Unit Price <br />I Cost <br />I Unit Price <br />I Cost <br />1.4 <br />ISOLAR POWERED SIGN LIGHT <br />3 <br />EACH <br />$ 6,600.00 <br />$ 19,800.00 <br />$ 90.00 <br />$ 270.00 <br />TERNATE #4 TOTAL <br />ALTERNATE #5 - SOLAR POWER SIGN LIGHTS FOR GATEWAYS IN ALTERNATES <br />19, 800.00 <br />Engineer's Estimate I Contractor <br />270.00 <br />Item No. <br />I Line Item <br />Quantity <br />Unit <br />Unit Price <br />I Cost <br />Unit Price <br />I Cost <br />1.5 <br />ISOLAR POWERED SIGN LIGHT <br />3 <br />EACH <br />$ 6,600.00 <br />$ 19,800.00 <br />1 $ 90.00 <br />Is 270.00 <br />FERNATE #5 TOTAL <br />ALTERNATE #6 - IRONWOOD SIGN 36 <br />19,800.00 <br />Engineer's Estimate I Contractor <br />270.00 <br />Item No. <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />Unit Price <br />Cost <br />1.6 <br />Gx-5a VEHICULAR TRAILBLAZER SIGN (ON 2" SQUARE POST) <br />1 <br />EACH <br />$ 1,900.00 <br />$ 1,900.00 <br />Is 1,550.00 <br />1 $ 1,550.00 <br />ALTERNATE #6 TOTAL I I$ 1,900.00 1 1$ 1,550.00 1 <br />BASE BID TOTAL <br />$ 145,901.00 <br />ALTERNATE #1 TOTAL <br />$ 19,567.00 <br />ALTERNATE #2 TOTAL <br />$ 19,567.00 <br />ALTERNATE #3 TOTAL <br />$ 18,187.00 <br />ALTERNATE #4 TOTAL <br />$ 270.00 <br />ALTERNATE #5 TOTAL <br />$ 270.00 <br />ALTERNATE #6 TOTAL <br />$ 1,550.00 <br />TOTAL PROJECT COST 205,312.00 <br />Engineer's Estimate Contractor <br />Non -Collusion Affidavit YES <br />Bid Bond I I YES <br />Responsible Bidder Documentation & Letter I I YES <br />MWBE Goals Met YES <br />MWBE Good Faith Effort YES <br />It appears that Geograph at least attempted to find a minority business with 3 listed as <br />contacted, however did find a woman owned. <br />I hereby certify that the above truly and accurately represents bids received for this project on December 12, 2023 <br />"--e 00W41A_ <br />Austin Blomeke, Landscape Architect <br />a �•• \sr <br />RFo . <br />N0.f <br />• : LA22200037 • <br />r'. STATE OF 1 ti <br />�///mcgPE ARC �� <br />H:\2019 Projects\2019-0230\Bidding\323-013JPR Bid Tabulation 2023-12-12 <br />