My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
No. 3132 approving and authorizing the Execution of an Addendum to the Master Agency Agreement (Studebaker Plaza Project construction oversignt)
sbend
>
Public
>
Redevelopment Commission
>
Resolutions
>
No. 3132 approving and authorizing the Execution of an Addendum to the Master Agency Agreement (Studebaker Plaza Project construction oversignt)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2014 9:47:27 AM
Creation date
4/1/2013 10:26:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0k BASIC COMPENSATION <br />The following is a schedule of professional fees for the scope of work identified for a <br />complete Construction Documents Bid Package. The lump sum fee will be twenty -six <br />thousand six hundred dollars ($26,600.00). <br />FEE BREAKDOWN <br />Civil Engineering $ 5,000.00 <br />(Abonmarche — direct quote) <br />Landscape Design $ 3,500.00 <br />(Abonmarche — direct quote) <br />Construction Documents $ 10,000.00 <br />Bidding Assistance $ 3,500.00 <br />(schedule dependent upon Commission meeting dates) <br />ESTIMATED SCHEDULE <br />3.0 week <br />1.0 week <br />3.0 weeks <br />6.0 weeks <br />Construction Administration $ 3,600.00 4.0 months <br />(4 Equal Payments) Construction <br />Time <br />Reimbursable Expenses $ 1,000.00 N/A <br />(not to exceed amount) <br />TOTAL $ 26,600.00 <br />ADDITIONAL SERVICES <br />Additional Services shall be any work outside the scope of Basic Services. Additional <br />Services will be provided only upon written authorization by the Owner. (See <br />Attachment for Hourly Rate Schedule.) Additional Services include but are not limited <br />to: <br />• On -site project representation. <br />• Conformed construction documents. <br />• As- designed Record Drawings. <br />• As- constructed Record Drawings. <br />• Extensive environmentally responsible design. <br />
The URL can be used to link to this page
Your browser does not support the video tag.