My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-08-29 Minutes
sbend
>
Public
>
Redevelopment Authority
>
Minutes
>
1980-1989
>
1989
>
1989-08-29 Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2008 12:28:59 PM
Creation date
7/24/2008 12:28:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J <br />SOUTH BEND REDEVELOPMENT AUTHORITY <br />SPECIAL MEETING <br />u <br />August 29, 1989 1200 County-City Building <br />8.OO a.m. 227 W. Jefferson Boulevard <br />• South Bend, Indiana 46601 <br />The August 29, 1989 Special Meeting of the Redevelopment Authority was called to <br />order at 8:10 a.m. by its President, Thomas J. Varga, Jr. There. was aquorum <br />present. <br />1. Roll Call <br />Members Present: <br />Legal Counsel: <br />Redevelopment Staff: <br />Mr. Thomas J. Varga, Jr. <br />Mr. Chris Davey <br />Mr. Joseph Wroblewski <br />Mr. Richard A. Nussbaum II <br />Mrs. Ann Kolata, Director <br />Mrs. Martha Lantz <br />2. Status report on St. Joseph/Wayne Street Parking Garage- <br />. Mrs. Kolata reported that the parking facility will probably be open the last <br />week in September. The largest items that are-not complete are the elevators <br />in the stair towers. <br />Mr. Davey asked how far behind schedule the contractor is. Mrs. Kolata <br />responded that the original completion date was mid-May. They were granted a <br />one or two week extension, but are accruing a $500 per day penalty since the <br />end of May. <br />Mrs. Kolata noted-that the contractors. They have ground it smooth and are <br />painting the ceilings, columns and inside walls with an off-white. plaster <br />paint. The effect is a-very bright appearance inside. <br />The elevator that fronts on Wayne Street will have a glass front.. The back <br />.elevator will not be glass fronted. In order to make the garage accessible <br />for skywalks, the back elevator will have to be double sided, with a front <br />and back door. Double sided elevators cannot be glass. <br />The engineers have designed skywalks to the Penney`s building and the IBM <br />building. We have been meeting with the owners of those buildings to explore <br />the possibility of having skywalks to connect the garage to each. They .would <br />not be elaborate skywalks like the one between Century Center and the <br />Marriott Hotel. They would be 20` and 26` long and 7` wide on the inside. <br />They would not be heated or cooled, simply ventilated. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.