My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 3 to OEA - South Well WTP Imprv. Proj No. 117-059 – Donohue & Associates, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 3 to OEA - South Well WTP Imprv. Proj No. 117-059 – Donohue & Associates, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 11:04:40 AM
Creation date
12/19/2023 11:04:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TASK ORDER #08 TO <br />CONTINUING PROFESSIONAL SERVICES AGREEMENT <br />Between Board of Public Works, City of South Bend, Indiana (Owner) <br />and <br />Donohue & Associates, Inc. (Donohue) <br />Date of Original Executed Agreement: August 8, 2017 <br />TASK ORDER NAME/DESCRIPTION <br />Task Order #08: Tank Conceptual Cost Opinions and Geotechnical Investigation <br />This Task Order #08 adds additional engineering services to the final design of the South Water Treatment <br />Plant (WTP) included in Task Order #07. <br />The additional engineering services associated with this Task Order include: <br />1.Development of Detention Alternatives Cost Opinions <br />2.Geotechnical Engineering Investigation <br />As the Task Order #07 WTP design services progressed, it was determined that the additional services <br />included in this Task Order #08 would be required in order to continue the design. As such, the services <br />included herein this Task Order #08 have commenced and been completed in conjunction with Task Order <br />#07 services and under Owner direction. <br />A. SCOPE OF SERVICES <br />1.Detention Alternatives Cost Opinions <br />1.1.Donohue will prepare cost opinions for the following raw water storage conceptual <br />alternatives: <br />1.1.1.Underground Concrete Tank <br />1.1.2.Above Ground Steel Storage Tank <br />1.1.3.Steel Pressure Vessels <br />1.1.4.Extended Site Water Main. <br />1.2.Cost opinions will include a general description of the raw water storage concept and include <br />breakdown of different disciplines.
The URL can be used to link to this page
Your browser does not support the video tag.