My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No. 1 to PSA - WWTP Final Clarifier Proj No. 119-069 – Arcadis U.S., Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No. 1 to PSA - WWTP Final Clarifier Proj No. 119-069 – Arcadis U.S., Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2023 11:04:33 AM
Creation date
12/19/2023 11:04:26 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Amy Smitley(Technical Advisor)John Huston (QAQC)Ben Burroughs(Project Manager)Brett Schnur(Engineer)Matt Hemmelgarn(Structural Engineer)Matt Palte(Structural Engineer)CAD DrafterShelly Baxter(Assistant)SubconsultantTOTAL LABOR <br />TASK DESCRIPTION HOURS COST EXPENSES TOTAL <br />PM Project Management 16 24 40 80 14,960 14,960 <br />1. General Construction Administration 12 20 45 75 12 8 40 212 31,640 400 32,040 <br />2. Meetings and Inspections 20 24 160 80 24 308 56,640 800 57,440 <br />3. Submittals 12 40 40 24 116 19,530 19,530 <br />4. Record Drawings 4 12 24 8 40 88 9,250 300 9,550 <br />5. Design Document Updates 4 4 15 25 12 40 100 11,400 11,400 <br />6. Subconsultant - Donohue (Electrical and I&C)30,175 30,175 <br />TOTAL ESTIMATED HOURS 56 60 296 244 80 8 120 40 904 173,595 <br />HOURLY RATES $286 $196 $196 $138 $159 $254 $29 $142 <br />TOTAL 16,016$ 11,760$ 58,016$ 33,672$ 12,720$ 2,032$ 3,509$ 5,680$ 173,595$ 1,500$ 175,100$ <br />ESTIMATED NOT-TO-EXCEED COMPENSATION:175,100$ <br />Estimated Compensation - ARCADIS U.S., Inc. <br />11/06/23 <br />CITY OF SOUTH BEND <br />Final Clarifier Nos. 1 through 3 Construction Administration Services <br />DIVISION OF ENVIRONMENTAL SERVICES <br />Wastewater Treatment Plant
The URL can be used to link to this page
Your browser does not support the video tag.