My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Long Term Occupancy Permit - Beacon Memorial Walsh Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Licenses & Permits
>
Long Term Occupancy Permit - Beacon Memorial Walsh Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 2:16:35 PM
Creation date
12/12/2023 1:44:14 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Recommendations
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.1-1-117r-i Fr1 . <br />City of South Bend Public Works u rd Phone: 574.235.9251 <br />Engineering Division <br />227 W. Jefferson, County City Building 1316 Fax: 574.235.9171 <br />South Bend, IN 46601 1830 %. Email:rowpermitsoffice@southbendio.gov <br />CURB CUT APPLICATION <br />Requires 3 WORKING days minimum for review by Engineering Division prior to Construction <br />Submission Date: Z -7 Applicant Name: (-1,e1j-4 <br />Contact Information (Phone and Email): <br />Property Address: G/s, / /tic P J .� .�;.•�� �� _ r,-/ 3160d / /Kn 14AI L <br />a. , 4 { <br />Type of Curb Cut: <br />❑ Residential Driveway ❑ Commercial Driveway - 24' Maximum Width ❑ Alley Approach - 14' Typical Width <br />❑ 10' (Single) <br />Industrial Driveway - 30' Maximum Width <br />❑ 16' (Max Width) .2'YcA/s•S' <br />Complete each item: <br />1. Does the existing lot meet setback requirements for the governing district? 101yes ❑ No <br />2. For lots being improved, has a variance been granted from the Board of Zoning Appeals? <br />FN/A ❑ Yes ❑ No <br />3. Are there any intersections within 50' of the proposed residential drive? ❑ Yes 2r No <br />(Industrial approach requires 100' distance from intersections) Provide Proximity <br />4. Are there any obstructions near the drive? (i.e light poles, hydrants etc.) If so, list <br />here: <br />5. Does the existing property have access to garage via an alleyway? <br />6. Does the proposed work meet clear sight area requirements? <br />Additional Comments: <br />❑ Yes 0 No <br />❑ Yes [f No <br />21Yes ❑ No <br />Drawing of proposed work must be included with this application <br />"Contractor bonded with Public Works shall pull a permit for construction work in the Right of Way <br />ENGINEERING OFFICE USE ONLY: <br />❑Approved []Approved as Noted ❑Denied as Noted ❑Traffic Study Required <br />Comments: <br />Date: <br />Engineering Division Authorized Signature <br />--New engineering review and approval required after 3 months if no permit has been issued for work - <br />Version 2.1 [1/15/2021] <br />
The URL can be used to link to this page
Your browser does not support the video tag.