Laserfiche WebLink
Exhibit A <br />SDS <br />Project:LDS <br />Date:3-Nov-23 ADS PLA <br />Prepared By:RJH EDS PS RA <br />Staff Type = UFT RPR2 RPR1 EFT SF2 SF1 ENS UMS GS PG PE2 PE1 MS1 MS2 PPS <br />Item Hours Total Fee Rate $115 $110 $120 $90 $115 $150 $90 $115 $125 $148 $160 $200 $225 $160 $250 <br />Topo Fieldwork 32.0 $4,240 16 16 <br />Professional Survey 22.0 $3,550 14 8 <br />Construction Plans 72.0 $11,700 36 36 <br />Sub-Total:$19,490 <br />Fee Estimate (incl. manhour justification) <br />High Street Sidewalk <br />Sidewalk and Stormwater Design <br />J:\Proposals\City of South Bend\2023\High Street Sidewalk\2023-10-01 Fee Estimating Worksheet - High Street Sidewalk Page 1 pf 1