Laserfiche WebLink
Page 1 <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />AGREEMENT <br />BETWEEN OWNER AND ENGINEER <br />FOR <br />PROFESSIONAL SERVICES <br />THIS IS AN AGREEMENT effective as of _December 12, 2023_______________ (“Effective Date”) <br />between <br />Board of Public Works, City of South Bend, Indiana ("Owner") and <br />Jones Petrie Rafinski ______________________________________________________(“Engineer”). <br />Owner's Project, of which Engineer's services under this Agreement are a part, is generally identified as <br />follows: <br />High Street Sidewalk Design _________________________(“Project"). <br />Engineer’s Services under this Agreement are generally identified as follows: <br />Site survey and design of approximately 1100 linear feet of existing sidewalk and road edge to install new curb and drainage and five-foot pedestrian sidewalk along High Street in South Bend from Donmoyer Ave <br />south to the entrance of Miami Hills Apartments, including two drive approaches. <br />Owner and Engineer further agree as follows: <br />1.01 Basic Agreement and Period of Service <br />A.Engineer shall provide, or cause to be provided, the services set forth in this Agreement. If <br />authorized by Owner, or if required because of changes in the Project, Engineer shall furnish <br />services in addition to those set forth above. Owner shall pay Engineer for its services as set forth <br />in Paragraphs 7.01 and 7.02. <br />B.Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: [It is the desire of the City to have this design project completed and ready to quote or bid <br />by spring of 2024, 60 days from NTP. Assuming no weather implications for collection of survey <br />information, JPR can have complete construction plans and special provision documents prepared <br />by end of February 2024, and ready for bid at the first Board of Public Works meeting in <br />February. JPR will also provide a cad drawing for contractor use and layout]. <br />C.If the Project includes construction-related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding _N/A_ months. If the actual time to complete construction exceeds the