Laserfiche WebLink
<br /> Page 2 <br />Exhibit C ––Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period. <br /> <br />   <br />     <br />