Laserfiche WebLink
<br /> Page 6 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />21. Wetlands or “waters of the US” assessment, delineation, or mitigation design and submittal <br />to USACE (Section 404) and state environmental agencies, or floodplain or floodway <br />analysis, modeling, and submittals to state water resource agencies and FEMA <br /> <br />PART 4 – CLARIFICATIONS, ASSUMPTIONS, AND OWNER PROVIDED ITEMS <br />Engineer has assumed the following: <br />A. No variances or annexations will be required for the project. <br />B. The Owner will make all presentations for public hearings. Engineer will provide technical <br />assistance as noted in the scope of services above. <br />C. Any title work that may be required will be provided by the Owner. <br />D. We shall have no responsibility for oversight or supervision of the contractors or their <br />employees, for the means and methods of construction, or for the safety of persons on or <br />off the job site. We shall have no responsibility to inspect for, or remove, hazardous <br />materials. <br />E. The project is to be executed using the design-bid-build delivery method. <br />F. Building Information Modeling (“BIM” using Autodesk Revit software), if used, will be <br />utilized only during the design phase for project coordination and production of permit and <br />construction documents. The final deliverable will be printed (paper) plans and details. <br />G. Amenities such as site lighting, signage, dumpster enclosures, mechanical enclosures, <br />monuments, or significant features will be designed by others. Engineer can assist in <br />coordinating these items or provide additional design services to complete them. <br />H. Engineer is not responsible for any fees related to permitting or utility services, including <br />permit fees, application fees, tap fees, inspection fees, usage fees, interceptor fees, etc., <br />unless specifically noted herein. If requested, Engineer may prepare fee estimates based on <br />the available information and our experience. However, the owner acknowledges that these <br />fees are estimates and the municipality or utility company will prepare the actual fees. The <br />Owner will be responsible for all permitting and utility fees that may be required. <br />I. The site has no environmental issues, and no wetland/stream permitting is required. <br />J. Water, sanitary, storm sewer, and other utilities are available at the property, and thus no <br />off-site utility extensions will be required. <br />K. Geotechnical, environmental, or material testing services and reports required to design and <br />construct the project are to be provided by the owner/client (including, but not limited to <br />pavement design recommendations). <br />L. For the purposes of this proposal, we have assumed cast-in-place concrete construction <br />with limited elements of structural steel. <br />M. Foundations are existing to remain. <br /> <br />   <br />     <br />