Laserfiche WebLink
<br /> Page 5 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />4. Additional site visits in excess of the quantity listed above. <br />5. Preparation of color renderings or models beyond those included in the scope of services. <br />6. Preparation of exhibits for site or building variances or attendance at meetings and public <br />hearings for such variances <br />7. Preparation of exhibits for zoning hearings or variances or attendance at meetings and/or <br />hearings for such variances <br />8. Review and design of alternate or substitute systems <br />9. Design or field observation of shoring and bracing for excavations and buildings or <br />underpinning of adjacent structures. <br />10. Design of supports for mechanical, electrical, plumbing, or fire protection elements, other <br />than the main ceiling grid support system. <br />11. Design of pile-supported or other non-conventional foundation systems <br />12. Special inspection services <br />13. Design, detailing, and shop drawing preparation of light-gauge metal framing components, <br />assemblies, and connections. (These items are assumed to be performance specification <br />items designed by the supplier.) <br />14. Analysis of floor slabs or framing systems for temporary or construction loads, such as lift <br />trucks, vehicle loads, etc., other than defined above <br />15. Any additional on-site or off-site topographic or utility survey, ALTA/ACSM land title <br />survey, boundary surveys, primary or secondary platting, land acquisition or appraisal <br />services, tree survey, private utility locates, construction staking, easement, or right-of-way <br />descriptions and/or exhibits, easement vacations, and as-built surveys. <br />16. Studies: Phase I or Phase II Environmental Site Assessment, environmental impact report, <br />asbestos survey, traffic impact study, traffic signal warrant analysis, geotechnical <br />investigations and reports, soil borings, materials testing, endangered species reports, etc. <br />17. Tree preservation plans, site lighting/photometric plans, signage plans, retaining walls, <br />amenity plans, and exterior architectural features design. <br />18. Phased construction plans, preparation of opinion of probable construction cost, earthwork <br />calculations, construction observation, and owner’s representative services, except as <br />defined above <br />19. Sanitary sewer or storm sewer lift station design, sanitary sewer plan/profile, or water main <br />plan/profile <br />20. Off-site infrastructure improvement plans or details (road, sewer, water, sanitary, utility, or <br />drainage), bridge construction plans, any unforeseen utility relocation plans, or major <br />improvements to public roads, such as adding or reconfiguring turning lanes and traffic <br />control devices. <br />   <br />     <br />