<br />(Exhibit A – Engineer’s Services)
<br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services
<br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved.
<br />
<br />4. Additional site visits in excess of the quantity listed above.
<br />5. Preparation of color renderings or models beyond those included in the scope of services.
<br />6. Preparation of exhibits for site or building variances or attendance at meetings and public
<br />hearings for such variances
<br />7. Preparation of exhibits for zoning hearings or variances or attendance at meetings and/or
<br />hearings for such variances
<br />8. Review and design of alternate or substitute systems
<br />9. Design or field observation of shoring and bracing for excavations and buildings or
<br />underpinning of adjacent structures.
<br />10. Design of supports for mechanical, electrical, plumbing, or fire protection elements, other
<br />than the main ceiling grid support system.
<br />11. Design of pile-supported or other non-conventional foundation systems
<br />12. Special inspection services
<br />13. Design, detailing, and shop drawing preparation of light-gauge metal framing components,
<br />assemblies, and connections. (These items are assumed to be performance specification
<br />items designed by the supplier.)
<br />14. Analysis of floor slabs or framing systems for temporary or construction loads, such as lift
<br />trucks, vehicle loads, etc., other than defined above
<br />15. Any additional on-site or off-site topographic or utility survey, ALTA/ACSM land title
<br />survey, boundary surveys, primary or secondary platting, land acquisition or appraisal
<br />services, tree survey, private utility locates, construction staking, easement, or right-of-way
<br />descriptions and/or exhibits, easement vacations, and as-built surveys.
<br />16. Studies: Phase I or Phase II Environmental Site Assessment, environmental impact report,
<br />asbestos survey, traffic impact study, traffic signal warrant analysis, geotechnical
<br />investigations and reports, soil borings, materials testing, endangered species reports, etc.
<br />17. Tree preservation plans, site lighting/photometric plans, signage plans, retaining walls,
<br />amenity plans, and exterior architectural features design.
<br />18. Phased construction plans, preparation of opinion of probable construction cost, earthwork
<br />calculations, construction observation, and owner’s representative services, except as
<br />defined above
<br />19. Sanitary sewer or storm sewer lift station design, sanitary sewer plan/profile, or water main
<br />plan/profile
<br />20. Off-site infrastructure improvement plans or details (road, sewer, water, sanitary, utility, or
<br />drainage), bridge construction plans, any unforeseen utility relocation plans, or major
<br />improvements to public roads, such as adding or reconfiguring turning lanes and traffic
<br />control devices.