Laserfiche WebLink
<br /> Page 4 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />C. Final site walkthrough and punch list will be created at the Owner’s direction. This may <br />be performed at substantial completion or as a one-year warranty review but will include <br />photographed documentation of any concerns or final needs to be corrected by the <br />contractor. <br />D. LA will be available during construction to review and reply to RFIs, and/or product <br />submittals. <br />A1.04 Mechanical/Plumbing and Electrical <br />Engineer will engage Advanced Engineering Consultants (AEC) as the MEP design engineer based upon <br />the attached proposal. <br />A1.05 Low Voltage <br />Engineer will engage Korda/Nemeth Engineering, Inc. as the Low Voltage design engineer based upon the <br />attached proposal. <br />A1.06 Cost Estimating <br />Engineer will engage Blundall Associates, Inc. to provide Opinions of Probable Cost at the conclusion of <br />Schematic Design and the conclusion of Design Development based on the attached proposal. <br />PART 2 – PROJECT SCHEDULE <br />A detailed project schedule will be developed based on the Owner’s review process along with the <br />timing of SBCSC’s relocation to another facility. Since this project will have multiple phases and <br />submittals, the overall schedule may be impacted by the response time of the city and state agencies. <br />Initial understanding is that SBCSC plans to move out by June 2024, so ideally CDs would be ready to <br />bid and award by that time. That would allow renovation work to commence mid-year 2024 with that <br />scope of work to be determined, but the City would envision being able to move into the facility in the <br />summer of 2025. <br /> <br />PART 3 – ADDITIONAL SERVICES <br />A3.01 Additional Services Requiring Owner’s Written Authorization <br /> <br />A. If authorized in writing by Owner, Engineer shall furnish or obtain from others Additional Services <br />of the types listed below. <br />1. Services resulting from participation in a peer review process, other than the requirements <br />requested by the owner. <br />2. Services resulting from changes of scope or magnitude of the project as described above <br />and/or services resulting from changes made after the drawings are substantially complete. <br />3. Services resulting from corrections or revisions required because of errors or omissions in <br />construction by the contractor or from change orders resulting from requests by the owner. <br />   <br />     <br />