My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10.05 Limitation of Liability. <br />A. Except for insured claims arising or resulting from bodily injury, death or damage to real or <br />personal property, the total liability of Contractor party to the other on all claims, whether <br />in contract, warranty, tort, strict liability, or otherwise, arising out of the performance of this <br />Agreement, shall not exceed the Contract Price. EXCEPT FOR THE WILLFUL MISCONDUCT OR <br />RECKLESSNESS OF A PARTY, OR FOR ANY LOSSES COVERED UNDER AN INSURED CLAIM FOR <br />BODILY INJURY, DEATH OR DAMAGE TO REAL OR PERSONAL PROPERTY, IN NO EVENT WILL <br />EITHER PARTY BE LIABLE TO THE OTHER PARTY FOR INDIRECT, CONSEQUENTIAL, SPECIAL, <br />SPECULATIVE, PUNITIVE, OR REMOTE DAMAGES. <br />ARTICLE 11- CONTRACT DOCUMENTS <br />11.01 Contents <br />A. The Contract Documents consist of all of the following: <br />This Agreement inclusive of the Request for Qualifications subject to scope clarifications in Exhibit A <br />("RFQ"). <br />Bonds: <br />a. Payment Bond within seven (7) days of Notification of Award for an amount equal <br />to one hundred percent (100%) of the contract amount. <br />b. Performance Bond within seven (7) days of Notification of Award for an amount <br />equal to one hundred twenty-five percent (125%) of the contract amount. <br />c. Maintenance bond within ten (10) days of acceptance of the project by the City of <br />South Bend, for an amount equal to ten percent (10%) of the final contract price, <br />guaranteeing for a period of three (3) years after the date of acceptance of the <br />project by the City of South Bend. <br />Preliminary Design drawings (not attached but incorporated by reference) as provided as a part of the <br />RFQ documents. <br />Exhibits to this Agreement (enumerated as follows): <br />d. Exhibit A Scope of Work <br />e. Exhibit B Proposal & Open Book Structure <br />f. Exhibit C Performance Guarantee <br />g. Exhibit D Support Services <br />h. Exhibit E Special Conditions and GSC Compliance <br />Exhibit F Indiana State Revolving Fund (SRF) <br />Exhibit G General Conditions EJCDC C-700 2007 <br />The following which may be delivered or issued on or after the Effective Date of the Contract and are not <br />attached hereto: <br />k. Notice to Proceed. <br />EJCDC° C-525, Agreement between Owner and Contractor for Construction Contract (Cost -Plus -Fee). <br />Copyright° 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 6 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.