4. No use or occupancy or separate operation of part of the Work may occur prior to compliance <br />with the requirements of Paragraph 5.10 regarding property insurance. <br />14.06 Final Inspection <br />A. Upon written notice from Contractor that the entire Work or an agreed portion thereof is <br />complete, Engineer will promptly make a final inspection with Owner and Contractor and will <br />notify Contractor in writing of all particulars in which this inspection reveals that the Work is <br />incomplete or defective. Contractor shall immediately take such measures as are necessary to <br />complete such Work or remedy such deficiencies. <br />14.07 Final Payment <br />A. Application for Payment: <br />1. After Contractor has, in the opinion of Engineer, satisfactorily completed all corrections <br />identified during the final inspection and has delivered, in accordance with the Contract <br />Documents, all maintenance and operating instructions, schedules, guarantees, bonds, <br />certificates or other evidence of insurance, certificates of inspection, marked -up record <br />documents (as provided in Paragraph 6.12), and other documents, Contractor may make <br />application for final payment following the procedure for progress payments. <br />2. The final Application for Payment shall be accompanied (except as previously delivered) by: <br />a. all documentation called for in the Contract Documents, including but not limited to the <br />evidence of insurance required by Paragraph 5.04.13.6; <br />b. consent of the surety, if any, to final payment; <br />c. a list of all Claims against Owner that Contractor believes are unsettled; and <br />d. complete and legally effective releases or waivers (satisfactory to Owner) of all Lien <br />rights arising out of or Liens filed in connection with the Work. <br />3. In lieu of the releases or waivers of Liens specified in Paragraph 14.07.A.2 and as approved <br />by Owner, Contractor may furnish receipts or releases in full and an affidavit of Contractor <br />that: (i) the releases and receipts include all labor, services, material, and equipment for <br />which a Lien could be filed; and (ii) all payrolls, material and equipment bills, and other <br />indebtedness connected with the Work for which Owner might in any way be responsible, or <br />which might in any way result in liens or other burdens on Owner's property, have been paid <br />or otherwise satisfied. If any Subcontractor or Supplier fails to furnish such a release or <br />receipt in full, Contractor may furnish a bond or other collateral satisfactory to Owner to <br />indemnify Owner against any Lien. <br />B. Engineer's Review of Application and Acceptance: <br />1. If, on the basis of Engineer's observation of the Work during construction and final <br />inspection, and Engineer's review of the final Application for Payment and accompanying <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 57 of 62 <br />