My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
C. Contractor's Fee: The Contractor's fee for overhead and profit shall be determined as follows: <br />1. a mutually acceptable fixed fee; or <br />2. if a fixed fee is not agreed upon, then a fee based on the following percentages of the various <br />portions of the Cost of the Work: <br />a. for costs incurred under Paragraphs 11.0l .A.1 and 11.01.A.2, the Contractor's fee shall <br />be 15 percent; <br />b. for costs incurred under Paragraph 11.0l .A.3, the Contractor's fee shall be five percent; <br />c. where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee <br />and no fixed fee is agreed upon, the intent of Paragraphs 12.0l.C.2.a and 12.0l .C.2.b is <br />that the Subcontractor who actually performs the Work, at whatever tier, will be paid a <br />fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.0I.A. I <br />and 11.01.A.2 and that any higher tier Subcontractor and Contractor will each be paid a <br />fee of five percent of the amount paid to the next lower tier Subcontractor; <br />d. no fee shall be payable on the basis of costs itemized under Paragraphs 11.0l.A.4, <br />11.0l .A.5, and 11.01.B; <br />e. the amount of credit to be allowed by Contractor to Owner for any change which results <br />in a net decrease in cost will be the amount of the actual net decrease in cost plus a <br />deduction in Contractor's fee by an amount equal to five percent of such net decrease; <br />and <br />f. when both additions and credits are involved in any one change, the adjustment in <br />Contractor's fee shall be computed on the basis of the net change in accordance with <br />Paragraphs 12.0l .C.2.a through 12.0l .C.2.e, inclusive. <br />12.02 Change of Contract Times <br />A. The Contract Times may only be changed by a Change Order. Any Claim for an adjustment in <br />the Contract Times shall be based on written notice submitted by the parry making the Claim to <br />the Engineer and the other parry to the Contract in accordance with the provisions of Paragraph <br />10.05. <br />B. Any adjustment of the Contract Times covered by a Change Order or any Claim for an <br />adjustment in the Contract Times will be determined in accordance with the provisions of this <br />Article 12. <br />12.03 Delays <br />A. Where Contractor is prevented from completing any part of the Work within the Contract Times <br />due to delay beyond the control of Contractor, the Contract Times will be extended in an amount <br />equal to the time lost due to such delay if a Claim is made therefor as provided in Paragraph <br />12.02.A. Delays beyond the control of Contractor shall include, but not be limited to, acts or <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Paee 47 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.