My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
10.02 Unauthorized Changes in the Work <br />A. Contractor shall not be entitled to an increase in the Contract Price or an extension of the <br />Contract Times with respect to any work performed that is not required by the Contract <br />Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the <br />case of an emergency as provided in Paragraph 6.16 or in the case of uncovering Work as <br />provided in Paragraph 13.04.D. <br />10.03 Execution of Change Orders <br />A. Owner and Contractor shall execute appropriate Change Orders recommended by Engineer <br />covering: <br />1. changes in the Work which are: (i) ordered by Owner pursuant to Paragraph 10.0 LA, (ii) <br />required because of acceptance of defective Work under Paragraph 13.08.A or Owner's <br />correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; <br />2. changes in the Contract Price or Contract Times which are agreed to by the parties, including <br />any undisputed sum or amount of time for Work actually performed in accordance with a <br />Work Change Directive; and <br />3. changes in the Contract Price or Contract Times which embody the substance of any written <br />decision rendered by Engineer pursuant to Paragraph 10.05; provided that, in lieu of <br />executing any such Change Order, an appeal may be taken from any such decision in <br />accordance with the provisions of the Contract Documents and applicable Laws and <br />Regulations, but during any such appeal, Contractor shall carry on the Work and adhere to the <br />Progress Schedule as provided in Paragraph 6.18.A. <br />10.04 Notification to Surety <br />A. If the provisions of any bond require notice to be given to a surety of any change affecting the <br />general scope of the Work or the provisions of the Contract Documents (including, but not <br />limited to, Contract Price or Contract Times), the giving of any such notice will be Contractor's <br />responsibility. The amount of each applicable bond will be adjusted to reflect the effect of any <br />such change. <br />10.05 Claims <br />A. Engineer's Decision Required: All Claims, except those waived pursuant to Paragraph 14.09, <br />shall be referred to the Engineer for decision. A decision by Engineer shall be required as a <br />condition precedent to any exercise by Owner or Contractor of any rights or remedies either may <br />otherwise have under the Contract Documents or by Laws and Regulations in respect of such <br />Claims. <br />B. Notice: Written notice stating the general nature of each Claim shall be delivered by the claimant <br />to Engineer and the other party to the Contract promptly (but in no event later than 30 days) after <br />the start of the event giving rise thereto. The responsibility to substantiate a Claim shall rest with <br />the party making the Claim. Notice of the amount or extent of the Claim, with supporting data <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 41 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.