My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. Each submittal shall bear a stamp or specific written certification that Contractor has satisfied <br />Contractor's obligations under the Contract Documents with respect to Contractor's review <br />and approval of that submittal. <br />3. With each submittal, Contractor shall give Engineer specific written notice of any variations <br />that the Shop Drawing or Sample may have from the requirements of the Contract <br />Documents. This notice shall be both a written communication separate from the Shop <br />Drawings or Sample submittal; and, in addition, by a specific notation made on each Shop <br />Drawing or Sample submitted to Engineer for review and approval of each such variation. <br />D. Engineer's Review: <br />Engineer will provide timely review of Shop Drawings and Samples in accordance with the <br />Schedule of Submittals acceptable to Engineer. Engineer's review and approval will be only <br />to determine if the items covered by the submittals will, after installation or incorporation in <br />the Work, conform to the information given in the Contract Documents and be compatible <br />with the design concept of the completed Project as a functioning whole as indicated by the <br />Contract Documents. <br />2. Engineer's review and approval will not extend to means, methods, techniques, sequences, or <br />procedures of construction (except where a particular means, method, technique, sequence, or <br />procedure of construction is specifically and expressly called for by the Contract Documents) <br />or to safety precautions or programs incident thereto. The review and approval of a separate <br />item as such will not indicate approval of the assembly in which the item functions. <br />3. Engineer's review and approval shall not relieve Contractor from responsibility for any <br />variation from the requirements of the Contract Documents unless Contractor has complied <br />with the requirements of Paragraph 6.17.C.3 and Engineer has given written approval of each <br />such variation by specific written notation thereof incorporated in or accompanying the Shop <br />Drawing or Sample. Engineer's review and approval shall not relieve Contractor from <br />responsibility for complying with the requirements of Paragraph 6.17.C.1. <br />E. Resubmittal Procedures: <br />1. Contractor shall make corrections required by Engineer and shall return the required number <br />of corrected copies of Shop Drawings and submit, as required, new Samples for review and <br />approval. Contractor shall direct specific attention in writing to revisions other than the <br />corrections called for by Engineer on previous submittals. <br />6.18 Continuing the Work <br />A. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or <br />disagreements with Owner. No Work shall be delayed or postponed pending resolution of any <br />disputes or disagreements, except as permitted by Paragraph 15.04 or as Owner and Contractor <br />may otherwise agree in writing. <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Page 32 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.