My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
6.09 Laws and Regulations <br />A. Contractor shall give all notices required by and shall comply with all Laws and Regulations <br />applicable to the performance of the Work. Except where otherwise expressly required by <br />applicable Laws and Regulations, neither Owner nor Engineer shall be responsible for <br />monitoring Contractor's compliance with any Laws or Regulations. <br />B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or <br />Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not <br />limited to all fees and charges of engineers, architects, attorneys, and other professionals and all <br />court or other dispute resolution costs) arising out of or relating to such Work. However, it shall <br />not be Contractor's responsibility to make certain that the Specifications and Drawings are in <br />accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's <br />obligations under Paragraph 3.03. <br />C. Changes in Laws or Regulations not known at the time of opening of Bids (or, on the Effective <br />Date of the Agreement if there were no Bids) having an effect on the cost or time of performance <br />of the Work shall be the subject of an adjustment in Contract Price or Contract Times. If Owner <br />and Contractor are unable to agree on entitlement to or on the amount or extent, if any, of any <br />such adjustment, a Claim may be made therefor as provided in Paragraph 10.05. <br />6.10 Taxes <br />A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid by <br />Contractor in accordance with the Laws and Regulations of the place of the Project which are <br />applicable during the performance of the Work. <br />6.11 Use of Site and Other Areas <br />A. Limitation on Use of Site and Other Areas: <br />Contractor shall confine construction equipment, the storage of materials and equipment, and <br />the operations of workers to the Site and other areas permitted by Laws and Regulations, and <br />shall not unreasonably encumber the Site and other areas with construction equipment or <br />other materials or equipment. Contractor shall assume full responsibility for any damage to <br />any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas <br />resulting from the performance of the Work. <br />2. Should any claim be made by any such owner or occupant because of the performance of the <br />Work, Contractor shall promptly settle with such other party by negotiation or otherwise <br />resolve the claim by some appropriate dispute resolution proceeding or at law. <br />3. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold <br />harmless Owner and Engineer, and the officers, directors, members, partners, employees, <br />agents, consultants and subcontractors of each and any of them from and against all claims, <br />costs, losses, and damages (including but not limited to all fees and charges of engineers, <br />architects, attorneys, and other professionals and all court or arbitration or other dispute <br />resolution costs) arising out of or relating to any claim or action, legal or equitable, brought <br />EJCDC C-700 Standard General Conditions of the Construction Contract <br />Copyright © 2007 National Society of Professional Engineers for EJCDC. All rights reserved. <br />Paee 28 of 62 <br />
The URL can be used to link to this page
Your browser does not support the video tag.