My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Construction Contract - LTCP WWTP Improvements Proj No. 121-071 – Bowen Engineering Corp.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:56:23 AM
Creation date
12/12/2023 1:42:18 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contractor has given Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that <br />Contractor has discovered in the Contract Documents. <br />Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that <br />without exception all prices in the Agreement are premised upon performing and furnishing the Work <br />required by the Contract Documents. <br />12.02 Contractor's Certifications <br />A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive <br />practices in competing for or in executing the Contract. For the purposes of this <br />Paragraph 8.02: <br />"corrupt practice" means the offering, giving, receiving, or soliciting of anything of value likely to influence <br />the action of a public official in the bidding process or in the Contract execution; <br />"fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding <br />process or the execution of the Contract to the detriment of Owner, (b) to establish Bid or Contract prices <br />at artificial non-competitive levels, or (c) to deprive Owner of the benefits of free and open competition; <br />"collusive practice" means a scheme or arrangement between two or more Bidders, with or without the <br />knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non-competitive levels; and <br />"coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property <br />to influence their participation in the bidding process or affect the execution of the Contract. <br />12.03 Standard General Conditions <br />A. Owner stipulates that if the General Conditions that are made a part of this Contract are <br />EJCDC° C-700, Standard General Conditions for the Construction Contract (2007), published <br />by the Engineers Joint Contract Documents Committee, and if Owner is the party that has <br />furnished said General Conditions, then Owner has plainly shown all modifications to the <br />standard wording of such published document to the Contractor, through a process such as <br />highlighting or "track changes" (redline/strikeout), or in the Supplementary Conditions. <br />EJCDC° C-525, Agreement between Owner and Contractor for Construction Contract (Cost -Plus -Fee). <br />Copyright° 2018 National Society of Professional Engineers, American Council of Engineering Companies, <br />and American Society of Civil Engineers. All rights reserved. <br />Page 8 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.