Laserfiche WebLink
ROOF SCAFFOLD <br />RIGGING OPENING <br />4 REO'D • 4'-m RAD <br />6 REO'D • 20'-0 RAD <br />12 REO'D • 36'-m RAD <br />(SEE DWG #5 SHT 47) <br />30 DIA RAINPROOF <br />ACCESS TUBE DOOR <br />CL ACCESS TUBE <br />MANHOLE HINGE <br />(SPECIAL LOCATION) <br />270° CL 30 DIA RAINPROOF <br />ROOF DOOR <br />CL INSIDE ACCESS TUBE — <br />LADDER <br />REMOVABLE <br />SAF-T-CLIMB <br />(SEE DWG #5 SHT #2 ) <br />0 <br />I <br />( <br />CL 6" DIA ACCCsS 18m° <br />TUBE VENT <br />(SEE DWG #5 SHT #7) <br />o ROOF ACCESSORY PLAN <br />(CUTOUTS AT 39'-0 RADIUS ARE SHOWN <br />ON DWG#5 SHT#6) <br />r <br />CL CABLE TRAYS <br />h (BY OTHERS) <br />6m DIA <br />ACCESS TUBE <br />--- ROOF HANDRAIL o <br />(SEE DWG #5 SHT #1) <br />-----9m° <br />CL CABLE TRAYS <br />(BY OTHERS) <br />' INDICATES CHANGE FROM PREVIOUS ISSUE <br />27m°---- <br />CL TANK LADDER <br />ACCE55 TUBE_ _ - <br />26m0--lCOR <br />1 <br />GENERAL NDTESi <br />1• SEE DRAWING 3. SHEET I. FOR SHAFT AND BELL <br />ARRANGEMENT. <br />�1 <br />xl2 <br />J <br />VI <br />I$0° <br />ACCESS TUBE PLAN <br />CL CABLE TRAYS <br />(BY OTHERS) <br />60 DIA ACCESS <br />TUBE <br />I, <br />_ CABLE TRAYS <br />(BY OTHERS) <br />6 <br />• <br />34?PI IE n'S 1 PID7�iASEA'S A] <br />GENERAL PLAN <br />Wa <br />4 � r <br />N <br />TANK SALL AND ACCESS TUBE PLAN <br />1.5 MMG x 96'-0 BCL WATERSPHEROID <br />m� <br />�$ <br />SOUTH BEND , IN <br />CUSTOMER'S NO JI111�1 <br />Or KC cflKo 60 air <br />G�iTRA[T k0 <br />I042MN <br />s <br />PLAMFIELgIJ.E. NANKIFES <br />— ENGINEERING A5 IIMD <br />SH1 I <br />�UIic He EEN p[!N[l 101 YY IS fl[ Ig0[m 7 plum RI� 04 Itq �'NR Nm <br />m CE 16iA mlY [n [O ln- lilt 1,11. L 7 A wIC1✓� 1pZ Nq 1Na ta` <br />a �+ <br />IS <br />pl,{N'pFI1P� p Ir0-F °I In PiMI Ip Nil PANG HPSLE IS p1p41 fsm;pa 4 <br />