Laserfiche WebLink
Version 9/29/2021 Page - 12 Public Works Quote <br />QUOTE/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME Northwest Elevated Tank Valve Vault Coating <br />PROJECT NO. 122-018B <br />QUOTES DUE December 12, 2023 <br />Item <br />No. Description Quantity Unit Unit Price Total Amount <br />1 <br />Removal and replacement of insulative <br />coatings to valve vault piping installed in <br />accordance with plans & specifications <br />including surface preparation, priming, <br />painting, testing, mobilization, <br />demobilization, etc., complete. <br />1 LS $ $ <br />2 Replace two FAA obstruction light <br />bulbs. 1 LS $ $ <br />3 Replace a broken hinge on the hatch to <br />the valve vault. 1 LS $ $ <br />Total Amount of Quote $ <br />Firm: <br />Address: <br />City/State/Zip: Telephone Number: ( ) <br />Fax Number: ( ) <br />By <br />(Signature) <br />(Printed Name of Person Signing) <br /> 500.00 500.00 <br />1,500.00 1,500.00 <br />44,486.00 44,486.00 <br />46,486.00 <br />Jetco, Ltd. <br />29693 N. US Highway 12 <br />Wauconda, IL 60084 847 438-4550 <br />847 438-3962 <br />Kenneth Brend, President