My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - Northwest Elevated Tank Valve Vault Coating Proj No. 122-018B - Jetco, Ltd.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Quotes - Northwest Elevated Tank Valve Vault Coating Proj No. 122-018B - Jetco, Ltd.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 1:32:06 PM
Creation date
12/12/2023 1:31:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/12/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Version 9/29/2021 Page - 8 Public Works Quote <br /> <br />CITY OF SOUTH BEND, INDIANA <br />CONTRACTOR’S QUOTE FOR PUBLIC WORK <br /> <br />PROJECT NAME: Northwest Elevated Tank Valve Vault Coating <br />PROJECT NO. 122-018B <br />QUOTES DUE December 12, 2023 <br /> <br /> (Must be completed for all quotes. Please type or print) <br /> <br />Date: Firm: <br />Address: <br />City/State/Zip: Telephone Number: ( ) <br />Agent of Bidder (if Applicable): <br />Pursuant to notices given, the undersigned offers to furnish labor and/or material necessary to complete the <br />public works project of: <br /> <br />the City of South Bend, Indiana, in accordance with plans and specifications prepared by: <br />The City of South Bend, Department of Public Works <br />and dated for the sum of (enter the Total Quote as shown on the Proposal) <br /> ($ ) <br />(Enter Sum of Total Quote plus Alternates shown on Proposal) (Numerical) <br /> <br />If alternative quotes apply, the undersigned submits a proposal for each in accordance with the notice. Any <br />addendums attached will be specifically referenced at the applicable page. <br /> <br />If additional units of material included in the contract are needed, the cost of units must be the same as that shown <br />in the original contract if accepted by the City of South Bend. If the quote is to be awarded on a unit basis, the <br />itemization of the units shall be shown on a separate attachment. <br /> <br /> <br /> <br /> <br /> <br /> <br />ACCEPTANCE <br /> <br />The above quote is accepted this day of 20 <br />Subject to the following conditions: <br /> <br />BOARD OF PUBLIC WORKS <br />Elizabeth A. Maradik, President Joseph R. Molnar, Vice President <br />Gary A. Gilot, Member Alexandra Dolz-Lane, Member <br />Murray L. Miller, Member <br /> Attest: Theresa M. Heffner, Clerk <br />By <br /> (Signature) <br /> <br /> (Printed Name of Person Signing) <br />December 12, 2023 Jetco, Ltd. <br />29693 N. US Highway 12 <br />Wauconda, IL 60084 847 438-4550 <br />Northwest Elevated Tank Valve Vault Coating <br />12/12/2023 <br />Forty-Six Thousand Four Hundred Eighty-Six Dollars and No Cents 46,486.00 <br />Kenneth Brend, President
The URL can be used to link to this page
Your browser does not support the video tag.