Laserfiche WebLink
8� <br />d <br />BID/PROPOSAL - d <br />CITY OF SOUTH BEND i_'. <br />Project Name: BerclifF Estates Sewer Separation Project '-- <br />Project Number: 122-016C <br />For Bids Due: December 12, 2023 <br />Contractor Name: Milestone Contractors North, Inc. <br />BASE BID <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 9,507.50 <br />$ 9,507.50 <br />2 <br />Clearing Right of Way <br />1 <br />LS <br />$ 10,600.00 <br />$ 10,600.00 <br />3 <br />Tree, Remove 24"-30" <br />7 <br />EA <br />$ 1,800.00 <br />$ 12,600.00 <br />4 <br />Tree, Protection and Trimming <br />1 <br />LS <br />$ 800.00 <br />$ 800.00 <br />5 <br />Structures and Obstructions, Remove <br />1 <br />LS <br />$ 8,100.00 <br />$ 8,100.00 <br />6 <br />Pipe, Remove <br />300 <br />LFT <br />$ 26.00 <br />$ 7,800.00 <br />7 <br />Fence, Wooden Privacy and Gate, 6 FT <br />Height, Remove and Reset <br />45 <br />LFT <br />$ 83.00 <br />$ 3,735.00 <br />8 <br />Excavation, Common <br />719 <br />CYS <br />$ 64.00 <br />$ 46,016.00 <br />9 <br />Embankment <br />22 <br />CYS <br />$ 100.00 <br />$ 2,200.00 <br />10 <br />Temporary Erosion Control Measures, Inlet <br />Protection <br />13 <br />EA <br />$ 400.00 <br />$ 5,200.00 <br />11 <br />Temporary Erosion Control Measures, Silt <br />Fence <br />670 <br />LFT <br />$ 5.00 <br />$ 3,350.00 <br />12 <br />Temporary Erosion Control Measures, Filter <br />Sock <br />60 <br />LFT <br />$ 7.00 <br />$ 420.00 <br />13 <br />Compacted Aggregate, No 53 <br />750 <br />TON <br />$ 60.00 <br />$ 45,000.00 <br />14 <br />HMA Surface, Type B <br />160 <br />TON <br />$ 124.00 <br />$ 19,840.00 <br />15 <br />HMA Intermediate, Type B <br />265 <br />TON <br />$ 113.00 <br />$ 29,945.00 <br />16 <br />HMA Base, Type B <br />420 <br />TON <br />$ 97.00 <br />$ 40,740.00 <br />17 <br />Asphalt for Prime Coat <br />5 <br />TON <br />$ 550.00 <br />$ 2,750.00 <br />18 <br />Asphalt for Tack Coat <br />1 <br />TON <br />$ 1,200.00 <br />$ 1,200.00 <br />19 <br />PCCP, 6", for Driveways <br />174 <br />SYS <br />$ 105.00 <br />$ 18,270.00 <br />20 <br />Curb, Concrete <br />500 <br />LFT <br />$ 40.00 <br />$ 20,000.00 <br />21 <br />Mailbox Assembly, Single <br />8 <br />EA <br />$ 480.00 <br />$ 3,840.00 <br />22 <br />Riprap, Class I <br />40 <br />TON <br />$ 135.00 <br />$ 5,400.00 <br />23 <br />Geotextile for Riprap, Type 2B <br />70 <br />SYS <br />$ 8.00 <br />$ 560.00 <br />24 <br />Mulched Seeding, U <br />1,345 <br />SYS <br />$ 9.70 <br />$ 13,046.50 <br />25 <br />Plant Growth Layer <br />150 <br />CYS <br />$ 110.30 <br />$ 16,545.00 <br />26 <br />JPl6 Ilalnntt, Deciduous Tree, Single Stem 2.5 IN. TO <br />9 <br />EA <br />$ 700.00 <br />$ 6,300.00 <br />27 <br />Storm Pipe, Type 2, Circular 12 IN <br />127 <br />LFT <br />$ 69.00 <br />$ 8,763.00 <br />28 <br />Storm Pipe, Type 2, Circular 18 IN <br />83 <br />LFT <br />$ 95.00 <br />$ 7,885.00 <br />Version 07/19/2023 Contactors's Bid for Public Work - 7 <br />