BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />Project Name: Bercliff Estates Sewer Separation Project
<br />Project Number: 122-016C
<br />For Bids Due: December 12, 2023
<br />Contractor Name: HRP Construction Inc.
<br />BASE BID
<br />Item
<br />No.
<br />Description
<br />Quantity
<br />Unit
<br />Unit Price
<br />Total Amount
<br />I
<br />Mobilization/Demobilization
<br />I
<br />LS
<br />34,600-00
<br />34,600.00
<br />2
<br />Clearing Right of Way
<br />I
<br />LS
<br />69,250.00
<br />69,250.00
<br />3
<br />Tree, Remove 24"-30"
<br />7
<br />EA
<br />1,800-00
<br />12,600.00
<br />4
<br />-Tree, Protection and Trimming
<br />I
<br />LS
<br />4,500.00
<br />4,500.00
<br />5
<br />Structures and Obstructions, Remove
<br />I
<br />LS
<br />20,250.00
<br />20,250.00
<br />6
<br />Pipe, Remove
<br />300
<br />LFT
<br />14.00
<br />4,200.00
<br />7
<br />Fence, Wooden Privacy and Gate, 6 FT
<br />Height, Remove and Reset
<br />45
<br />LFT
<br />74.00
<br />3,330.00
<br />8
<br />Excavation, Common
<br />719
<br />CYS
<br />86-00
<br />61,834.00
<br />9
<br />Embankment
<br />22
<br />CYS
<br />75.00
<br />1,650.00
<br />10
<br />Temporary Erosion Control Measures, Inlet
<br />Protection
<br />13
<br />EA
<br />225.00
<br />2925.00
<br />,
<br />I I
<br />Temporary Erosion Control Measures, Silt
<br />Fence
<br />670
<br />LFT
<br />4.50
<br />3,015.00
<br />12
<br />Temporary Erosion Control Measures, Filter
<br />Sock
<br />60
<br />LFT
<br />6.50
<br />390.00
<br />13
<br />Compacted Aggregate, No 53
<br />750
<br />TON
<br />55.o0
<br />41,250.00
<br />14
<br />HMA Surface, Type B
<br />160
<br />TON
<br />124.00
<br />19,840.00
<br />15
<br />HMA Intermediate, Type B
<br />265
<br />TON
<br />113-00
<br />29,945.00
<br />16
<br />HMA Base, Type B
<br />420
<br />TON
<br />97.00
<br />40,740.00
<br />17
<br />Asphalt for Prime Coat
<br />5
<br />TON
<br />550.00
<br />2,750.00
<br />18
<br />Asphalt for Tack Coat
<br />I
<br />TON
<br />1,200.00
<br />1,200.00
<br />19
<br />PCCP, 6", for Driveways
<br />174
<br />SYS
<br />105.00
<br />18,270.00
<br />20
<br />Curb, Concrete
<br />500
<br />LFT
<br />40.00
<br />20,0000.00
<br />21
<br />Mailbox Assembly, Single
<br />8
<br />EA
<br />250.00
<br />2,000.00
<br />22
<br />Riprap, Class 1
<br />40
<br />TON
<br />157.00
<br />6,280.00
<br />23
<br />Geotextile for Riprap, Type 2B
<br />70
<br />SYS
<br />20.00
<br />1,400.00
<br />24
<br />Mulched Seeding, U
<br />1,345
<br />SYS
<br />5.00
<br />6,725.00
<br />25
<br />Plant Growth Layer
<br />150
<br />CYS
<br />105.00
<br />15,750.00
<br />26
<br />Plant, Deciduous Tree, Single Stem 2.5 rN.
<br />TO 6 IN.
<br />9
<br />EA
<br />650.00
<br />5,850.00
<br />27
<br />Storm Pipe, Type 2, Circular 12 IN
<br />127
<br />LFT
<br />75.00
<br />9,525.00
<br />28
<br />Storm Pipe, Type 2, Circular 18 IN
<br />83
<br />LFT
<br />L 90.00
<br />7,470.00
<br />Version 07/19/2023 Contractor's Bid for Public Works - 7
<br />
|