Laserfiche WebLink
<br /> <br />FORM 96 ATTACHMENT <br /> <br /> <br />Section II: PLAN AND EQUIPMENT QUESTIONNAIRE <br /> <br />1. Our plan for performing the proposed work is as prescribed by the plan and bid documents as <br />developed through reviewing the plans, standard specifications and having previously comple ted <br />similar work. <br /> <br />2. We have used the following subcontractors on public works projects during the past five years: <br /> <br />Slusser’s Green Thumb <br />P.O. Box 33 Landscape, Sod Items <br />Logansport, IN 46947 <br /> <br />Traffic Control Specialists, Inc <br />1810 W. Pacific Ave. Traffic Items <br />Knox, IN 46534 <br /> <br />C-Tech Corporation, Inc. <br />5300 West 100 Norte Guardrail Items <br />Boggstown, IN 46110 <br /> <br />Brooks Construction Co., Inc <br />P.O. Box 9560 HMA Items <br />Fort Wayne, IN 46899 <br /> <br />3. It is not known at this time if any portion of the work will be sublet or if a bond would be required. <br /> <br />4. We have the following equipment available to use: <br /> <br />American Crane 50 Ton <br />Case Skidsteer <br />Case 550 Dozer <br />Gehl Mini Excavator <br />Gehl RS5-19 Telehandler <br />Ground Heater (2) <br />Hamm 3305 Roller <br />JD 650JC Dozer <br />JD 790 D Excavator w/hydraulic thumb <br />JD 270 Excavator <br />JD 200 LC Excavator <br />Kobelco Blade Runner <br />Komatsu CK30 Track Skidsteer (2) <br />Service Trucks, Kruz Dump Trailer and various other trailers <br />Semi-Truck and 50 Ton Lowboy <br />Mack Hook Truck <br />Various Pick-up Trucks and small tools <br /> <br />5. We have solicited and received material prices for this job. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />