My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 10:36:35 AM
Creation date
11/29/2023 10:36:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project:Coal Line Trail, Phase III <br />Client:City of South Bend <br />Des. No. <br />RFP No.:N/A <br />Lochgroup Project No.:123-3013 <br /> TOTAL TOTAL <br />TASK DESCRIPTION HOURS DOLLARS <br /> / TASK / TASK <br />DIRECT LABOR <br />Prelininary Field Check Plans <br />Project Coordination w/ City 2024 2 2 $108.11 <br />Preliminary Signal Layouts 2024 2 4 6 $278.44 <br />Plan Sheet Labeling Equip + Conduits+Cabling+ Diagrams + Notes 2024 4 6 10 $471.72 <br />Preliminary Quantities 2024 1 2 3 $139.22 <br />Estimate 2024 1 2 3 $139.22 <br />QA/QC 2024 2 2 4 $219.87 <br />Stage 3 Plans <br />Revise Signal Plans Per PFC Review 2025 1 2 3 $145.76 <br />Coordinate w/ Utilities for signal-specific conflicts 2025 1 1 2 $127.12 <br />Final Signal Plan Sheets 2025 3 3 6 $303.54 <br />Final Signal Detail Sheets 2025 1 2 3 $145.76 <br />Final Design Related Calcs 2025 1 1 $56.60 <br />Special Provisions 2025 1 1 2 $127.12 <br />Quantities and Cost Estimate 2025 2 2 $89.17 <br />QA/QC 2025 2 2 4 $230.20 <br />Final Tracings <br />Revise Plans per FFC Review 2025 2 2 4 $202.36 <br />Final Constr. Cost Est. & Final Est. of Quant.2025 2 2 4 $202.36 <br />Final Special Provisions 2025 1 2 3 $183.71 <br />QA/QC 2025 1 1 2 $115.10 <br />Total Hours ECI 8 24 32 0 0 0 0 0 0 64 $3,285.38 <br />Average Rate (2023)$64.33 $51.63 $40.67 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Average Rate (2024)4.7%$67.35 $54.06 $42.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Average Rate (2025)4.7%$70.52 $56.60 $44.58 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />Average Rate (2026)4.7%$73.83 $59.26 $46.68 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br /> $3,285.38 Total Direct Labor Cost <br />SIGNAL DESIGN <br />STAFF HOURS BY CLASSIFICATION <br />Rate Year Sr. Project <br />Manager I <br />Project Engineer <br />III <br />Project <br />Engineer I <br />2201235
The URL can be used to link to this page
Your browser does not support the video tag.