Laserfiche WebLink
Project:Coal Line Trail, Phase III <br />Client:City of South Bend <br />Des. No. <br />RFP No.:N/A <br />Lochgroup Project No.:123-3013 <br /> TOTAL TOTAL <br />TASK DESCRIPTION HOURS DOLLARS <br /> / TASK / TASK <br />DIRECT LABOR <br />Process Survey & Check Survey Notes 2023 2 8 10 $402.04 <br />Establish Horizontal Alignment 2023 1 2 4 7 $356.01 <br />Design Profile Grade 2023 1 1 8 10 $435.41 <br />Preliminary Drainage Analysis 2023 8 8 16 $625.68 <br />Preliminary Trail Corridor Model 2023 2 1 40 43 $1,701.02 <br />Prepare Typical Cross Section 2023 2 8 10 $441.84 <br />Preliminary Plan & Profile Sheets 2023 1 2 8 16 40 67 $2,766.65 <br />Preliminary Urban Design 2023 8 4 4 16 $879.72 <br />Preliminary MOT - Vehicular & Pedestrian 2023 4 8 8 20 $789.96 <br />Preliminary Cross Section Sheets 2023 2 8 10 $408.30 <br />Preliminary Clear Zone, Roadside Safety 2023 2 2 4 $156.42 <br />Level One Calcs and Checklist 2023 1 4 5 $227.01 <br />Level Two Calcs (ISD)2023 4 4 $162.68 <br />Abbreviated Engineering Assessment 2023 1 2 2 5 $220.75 <br />Preliminary Quantities & Cost Estimate 2023 4 8 8 20 $908.72 <br />QA/QC 2023 4 8 2 14 $957.24 <br />Submission to City 2023 4 2 2 4 12 $630.34 <br />SUBTOTAL: Preliminary Plans 4 19 24 0 44 114 0 68 0 273 $12,070 <br />Preliminary Field Check Plans <br />Revise plans per Stage 1 Review 2024 1 4 8 8 8 29 $1,361.11 <br />Coordinate Design with Geotech & Enviro 2024 4 4 $170.33 <br />Coordinate R/W 2024 4 4 $170.33 <br />Prelim. Approach, Drive & Intersection Details 2024 2 8 8 18 $804.93 <br />Curb Ramp Design 2024 50 46 96 $3,933.60 <br />Plan and Cross Section Updates 2024 2 8 16 16 42 $1,802.35 <br />Drainage Detail in Plans 2024 4 8 8 20 $827.09 <br />Review design on site 2024 12 12 $889.03 <br />Revision coordination 2024 4 4 $296.34 <br />QA/QC 2024 4 4 2 10 $732.82 <br />Meeting Preparation, Invites and Minutes 2024 1 2 2 2 7 $440.29 <br />Field Check Meeting 2024 2 2 2 2 8 $519.10 <br />SUBTOTAL: Preliminary Field Check Plans 7 9 30 0 28 94 0 86 0 254 $11,947 <br />Stage 3 Plans <br />Updates to Plans per PFC Meeting 2024 1 8 8 8 25 $1,064.77 <br />Finalize Plan & Profile Sheets 2024 1 1 2 16 16 40 76 $3,316.14 <br />Finalize Detail Sheets 2024 8 8 20 36 $1,789.16 <br />Finalize MOT - Vehicular & Pedestrian 2024 8 8 16 $682.98 <br />Pavement Markings & Signs 2024 1 2 2 4 9 $409.02 <br />Wayfinding signage programming/documentation 2024 8 4 4 4 20 $1,091.39 <br />Finalize Urban Design Coordination 2024 2 8 4 4 18 $1,078.68 <br />Project Summary Tables 2024 2 2 4 $163.77 <br />Earthwork and Summary Table 2024 1 1 $39.30 <br />Quantity Calculations 2024 2 4 4 10 $475.71 <br />Cost Estimate 2024 2 2 4 $233.33 <br />Special Provisions 2024 2 8 2 12 $806.00 <br />QA/QC 2024 4 8 2 14 $1,002.23 <br />Submission to City 2024 4 2 2 2 10 $581.36 <br />SUBTOTAL, Stage 3 Plans 7 16 43 0 56 45 0 88 0 255 $12,734 <br />Engineering Intern <br />III <br />Engineering Intern <br />II <br />2201235 <br />TRAIL LANDSCAPE ARCHITECTUE <br />Engineering <br />Designer II <br />STAFF HOURS BY CLASSIFICATION <br />Rate Year Senior Project <br />Manager II <br />Senior Project <br />Manager I <br />Senior Landscape <br />Architect <br />Project Engineer <br />III <br />Project Engineer <br />I <br />X:\Production\Files\2023\123-3013\Proposal\Draft Proposal\Fee Estimate\working\Des 2201235 Combined Fee Justification.xlsx