Laserfiche WebLink
<br /> PAGE 1 OF 1 APPENDIX “D” <br />APPENDIX “D” <br />COMPENSATION <br />1.0 AMOUNT OF PAYMENT <br />1.1 The CONSULTANT shall receive compensation for providing such professional <br />services under Appendix “A” of this Contract in the amount of a total fee not-to- <br />exceed Three Hundred Forty-Nine Thousand Seven Hundred Ten Dollars <br />($349,710.00), unless an amendment to this Contract is executed by the parties <br />that increases the maximum amount payable. <br />1.2 The CONSULTANT shall be paid for the work performed under Item 1.0, 2.0, <br />3.0, 4.0, 5.0, 6.0, 7.0, 8.0, and 9.0 of Appendix “A” of this Contract on a lump <br />sum basis, in accordance with the following lump sum fee schedule: <br />1.2.1. Topographic Survey Data Collection...........................................$26,510.00 <br />1.2.2. Urban Trail Design and Plans ....................................................$127,200.00 <br />1.2.3. Decorative Lighting Design .........................................................$21,600.00 <br />1.2.4. Traffic Signal Design ...................................................................$10,400.00 <br />1.2.5. Project Management ....................................................................$20,000.00 <br />1.2.6. Environmental Documentation ....................................................$65,700.00 <br />1.2.7. Permitting .......................................................................................$8,900.00 <br />1.2.8. Utility Coordination .....................................................................$26,400.00 <br />1.3 The CONSULTANT shall be paid for the work performed under Items 10.0 and <br />12.0 of Appendix “A” of this Contract on an hourly rate basis based on the rates <br />set forth in Exhibit “1” , attached hereto and incorporated herein by reference and <br />in accordance with the following not to exceed fee schedule: <br />1.3.1. Public Involvement ......................................................................$13,200.00 <br />1.3.2. Construction Phase Services ........................................................$12,200.00 <br />1.4 The CONSULTANT shall receive payment for Title Search Services performed <br />under Item 11.0 of Appendix “A” of this Contract based on the specific cost per <br />unit multiplied by the actual units of work performed in accordance with the <br />following schedule: <br />1.4.1. Title Reports (32 parcels @ $550 each).......................................$17,600.00 <br />2.0 METHOD OF PAYMENT <br />2.1 The CONSULTANT shall submit invoices to the LPA on a monthly basis for <br />services rendered. In no event shall the total of the CONSULTANT’s invoices <br />exceed the amount provided in this Appendix “D” without prior approval as <br />provided elsewhere in this Contract. <br />2.2 The LPA shall pay the CONSULTANT for said invoices within thirty (30) <br />calendar days for CONSULTANT’s services. <br /> <br />[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]