My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
LPA Consulting Contract - Coal Line Trail – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2023 10:36:35 AM
Creation date
11/29/2023 10:36:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page 2 of 2 <br /> <br /> <br /> <br />5. Verify the consultant has provided a fee proposal and the fee proposal includes the following: <br /> <br /> a. Itemization of task elements with estimated hours by employee classification. <br /> <br /> b. Cost calculations show the overhead rate and profit rate has been applied. <br /> <br />6. Analyze the Consultant Fee Proposal. <br /> <br /> a. Confirm the task elements are relevant to the scope of work. <br /> <br /> b. Confirm the proposal does not exceed the Escalation Values for INDOT Consultant Contracts. INDOT uses <br />the Bureau of Labor and Statistics Employment Cost Index (ECI) to determine appropriate escalation values. <br />INDOT’s guidelines are available under the Contract Compensation Information section at: <br />http://www.in.gov/indot/2730.htm. <br /> <br /> c. Confirm the overhead rate used in the fee proposal is consistent with or lower than the rate shown in the <br />consultant’s prequalification letter. <br /> <br /> d. Confirm, to the extent possible, major task element and overall cost totals are not excessive. <br /> <br />7. If the contract is for Construction Inspection, is an Engineer’s Assignment letter attached? <br /> <br /> a. Not Applicable <br /> <br /> b. Engineer’s Assignment is attached. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ERC Signature: Date: <br /> <br />Printed Name: <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.