Laserfiche WebLink
5. Verify the consultant has provided a fee proposal and the fee proposal includes the following: <br />a. ® Itemization of task elements with estimated hours by employee classification. <br />b. ® Cost calculations show the overhead rate and profit rate has been applied. <br />6. Analyze the Consultant Fee Proposal. <br />a. ® Confirm the task elements are relevant to the scope of work. <br />b. ® Confirm the proposal does not exceed the Escalation Values for INDOT Consultant Contracts. INDOT uses <br />the Bureau of Labor and Statistics Employment Cost Index (ECI) to determine appropriate escalation values. <br />INDOT's guidelines are available under the Contract Compensation Information section at: <br />http://www.in.gov/indot/2730.htin. <br />c. ® Confirm the overhead rate used in the fee proposal is consistent with or lower than the rate shown in the <br />consultant's prequalification letter. <br />d. ® Confirm, to the extent possible, major task element and overall cost totals are not excessive. <br />7. If the contract is for Construction Inspection, is an Engineer's Assignment letter attached? <br />a. ® Not Applicable <br />b. ❑ Engineer's Assignment is attached. <br />ERC Signature: <br />Printed Name: <br />Date: <br />Page 2 of 2 <br />