My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:10:11 PM
Creation date
11/28/2023 2:09:55 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Experience <br />CLIENT: City of Jeffersonville, Indiana <br />PROJECT DESCRIPTION: <br />This project included the reconstruction and widening of 10th Street in <br />Jeffersonville from four to five lanes. The fifth lane was turned into a <br />center turn lane. The improvements extended from Dutch Lane/Penn <br />Street to Reeds Lane along 10th Street. <br />United performed the construction inspection which included the <br />installation of new curb and gutter, storm sewer system, sanitary sewer, <br />retaining walls, new pedestrian-friendly and aesthetically pleasing <br />sidewalks on both sides of the road, new ADA-accessible curb ramps, <br />drive approaches, four new intersections with decorative traffic signals, <br />decorative street lighting, and signage. Special attention had to be <br />given to maintain the high volume of pedestrian traffic on this major <br />thoroughfare throughout the duration of this project.SERVICES PROVIDED BY UNITED: <br /> Construction Inspection <br /> Land Acquisition <br />10th Street Reconstruction & Widening <br />CLIENT: City of Evansville Department of Public Works & Recreation <br />PROJECT DESCRIPTION: <br />The project rehabilitated 2.5 miles of a four-lane urban road with turn <br />lanes and five major intersection improvements with ADA accessible <br />upgrades. Full-depth PCCP patching of existing concrete pavement, <br />new asphalt, new concrete pavement, and continuous curb and gutter <br />repairs were also included in the project. <br />The final project cost underran the original bid by $130k thanks to value <br />engineering practices in the field, as well as through partnering efforts <br />between United, the designer, Indianapolis DPW, and INDOT. After <br />working directly with the INDOT Project Manager and Area Engineer, <br />the savings were able to be utilized to provide additional sidewalk <br />improvements and ADA access from E. 30th Street to E. 36th Street/ <br />Decamp Dr. Additional environmental permitting was acquired through <br />a joint effort between United, DPW, and IDEM. Work was completed <br />under traffic and in coordination with Indianapolis Metro Bus Schedules. <br />Post Road Resurfacing from I-70 - 46th Street <br />SERVICES PROVIDED BY UNITED: <br /> Construction Inspection <br />UNITED CONSULTING CITY OF SOUTH BEND SAFE ROUTES TO SCHOOL AT OUR LADY OF HUNGARY - DES #2100025 (LAPORTE DISTRICT)10 HALL OF FAME
The URL can be used to link to this page
Your browser does not support the video tag.