My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Our Lady of Hungary Proj No 122-007 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:09:45 PM
Creation date
11/28/2023 2:09:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND | CE SERVICES FOR SAFE ROUTES TO SCHOOL AT OUR LADY OF HUNGARY AMERICAN STRUCTUREPOINT PAGE 3 <br />FIRM OVERVIEWRESOURCES THAT STREAMLINE THE CONSTRUCTION PROCESS <br />The American Structurepoint team offers a variety of unique resources that provide value-added benefits and efficiency <br />during the construction process. <br />TECHNICAL EXPERTISE <br />Over the last 55 years, our staff has provided <br />construction inspection services on more than <br />200 INDOT/LPA projects, including including <br />99 in the LaPorte District. We have the technical <br />expertise and understanding of the District’s <br />requirements for materials, testing, EEO, and <br />final construction records. Our inspectors <br />have developed an impressive set of technical <br />capabilities that allows them to document all <br />the daily work tasks performed at the job site. <br />Our staff will use their technical expertise on this <br />project to: <br />• Track and document construction material <br />quantities <br />• Test and sample materials used <br />• Review daily maintenance of traffic <br />• Address all concerns for safety <br />• Maintain project accounting and contractor <br />payrolls <br />EFFICIENCY <br />The construction process can take a considerable <br />amount of time, which is why keeping an eye <br />on efficiency throughout the entire project is so <br />important. To complete the construction phase <br />of this project in the most efficient manner <br />possible, our team will: <br />• Make timely and knowledgeable decisions <br />• Quickly evaluate immediate/long-term <br />effects of our decisions <br />• Coordinate among all parties through <br />transparency, communication, and fairness <br />• Quickly complete required project closeout <br />activities <br />• Prepare/submit final construction record <br />within 45 days of contractor’s relieved-of- <br />maintenance date <br />TOOLS <br />American Structurepoint has the means to tackle <br />projects of any magnitude and has implemented <br />an integrated engineering and drafting <br />environment conducive to heavy production. To <br />enhance productivity, American Structurepoint <br />provides our staff with the latest, most powerful <br />equipment and software. We have approximately <br />600 computers using Windows operating <br />systems. In addition, American Structurepoint’s <br />Construction Solutions Group is equipped with <br />the most up-to-date testing equipment, including: <br />• 16 Dynamic Cone Penetrometers <br />• 8 Lightweight Deflectometers <br />• Dynamic Cone Penetration (DCP) Testing <br />• Lightweight Deflectometer (LWD)
The URL can be used to link to this page
Your browser does not support the video tag.