Laserfiche WebLink
Proposal for City of South Bend - Our Lady of Hungary <br />PROJECT UNDERSTANDING & APPROACH <br />PROJECT UNDERSTANDING <br />Our Lady of Hungary School, located on Calvert Street, sits in the heart of the Rum Village neighborhood in <br />the City of South Bend. The project area bounded by Indiana on the north, Lafayette Boulevard on the east, <br />Ewing Avenue on the south and Olive Street on the west lies southwest of downtown. The area is bounded <br />(along Ewing Ave.) by the Rum Village Park on the south that includes a nature center, mountain bike trails, <br />rope course and a Frisbee golf course. This park serves not only the elementary students of the Our Lady of <br />Hungary School but also offers all residents of South Bend a taste of nature within the City limits. The park serves <br />as a destination for the students for after-school activities and a place for the local families to enjoy outdoor <br />recreation within the City. The project area has significant vertical relief from Ewing Avenue north to Indiana <br />Avenue making ADA compliant pedestrian access a challenge in some areas. The neighborhood also offers <br />Walker Field Park that is utilized for many little league and tee ball teams throughout the area. Lying just a <br />couple blocks away from the school sits the newly renovated US Armed Forces Reserve Center. In addition, the <br />area is transected by Indiana SR23 (SW to NE) that connects the neighborhood to the downtown and areas <br />beyond. <br />PROJECT APPROACH <br />We have tailored our scope of services based on the requirements of the RFP, our first hand experience with <br />the design of SRTS projects, and our extensive history and experience working in the City of South Bend and <br />with INDOT. Abonmarche’s team is creative, innovative, and most of all very experienced with all aspects of <br />INDOT construction projects. Our Project Manager, Rob Nichols, brings his extensive knowledge of construction <br />on INDOT projects as a contractor now to the inspection side. He managed the successful completion of <br />the Olive and Sample Street Overpasses, IR-30143 US 31 Connection on the south side of South Bend, the 2 <br />Way Downtown Street Conversion project, and the Riverside Trail Project along the river NW of downtown <br />South Bend. His in-depth experience of the INDOT process and public works construction will be invaluable in <br />administering and providing oversight on these inspection projects. <br />PROJECT INITIATION AND PRE-CONSTRUCTION <br />Prior to initiating a kick-off meeting with the City of South Bend our Project Manager and INDOT certified <br />construction inspection staff will do a thorough review of the bidding documents (plans and specifications) and <br />pair it with a detailed site visit of the project area. <br />After our review of the site, we will coordinate an inspection kick-off meeting with the City to discuss all aspects <br />of the project prior to having a pre-construction meeting. We will use this meeting as a chance to discuss <br />any potential subjects pertinent to the construction so that they may be addressed at the pre-construction <br />meeting. Only then will be schedule the pre-construction meeting with all required parties for commencement <br />of construction. We expect to have a pre-construction meeting within two weeks of the Notice to Proceed of <br />the Construction contract. <br />CONSTRUCTION PHASE <br />Upon commencement of construction Abonmarche and McCormick Engineering will monitor, as necessary, <br />the contract with a full-time Resident Project Inspector (RPR). Depending on the controlling operations of the <br />construction other full-time inspectors may be added. In addition to the Inspector(s) the RPR will oversee and <br />be available to answer any questions or issues that may arise during the regular course of daily construction. <br />And overseeing the entire inspection contract will be the Project Manager. He will guarantee overall contract <br />compliance and ensure a more than adequate amount of inspection and documentation is always taking <br />place during construction. He will also provide the final QA/QC effort for all construction documentation <br />generated for the project. If disputes with contract documents arise during the course of construction <br />Abonmarche will ensure that all change order requests, and other such disputes are handled per INDOT’s very <br />clear and structured process. This process, when followed and administered correctly, will ensure contract <br />compliance per all INDOT and FHWA requirements. This process protects the LPA and ensures that the contract <br />is delivered in accordance with all requirements – Local, State and Federal. <br />8