My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - United Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - United Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 10:04:01 AM
Creation date
11/28/2023 2:09:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Experience <br />CLIENT: City of Cicero, Indiana <br />PROJECT DESCRIPTION: <br />The project included a walkway along the Morse Reservoir/Jackson <br />Street Causeway and a safe pedestrian connection between Red Bridge <br />Park and Community Park. Shell -piles were a cost-effective solution for <br />the 21-span structure. The three main spans over the waterway utilize <br />prefabricated steel trusses while the remaining spans utilize side -by - <br />side concrete box -beams with a concrete overlay. Steel sheet piling, <br />with a concrete face, was used to tie the proposed walkway into the <br />existing topography. A major challenge for this project was coordinating <br />the construction with the existing utilities which included overhead <br />power lines parallel to the alignment of the pedestrian bridge. The <br />power utility relocated their facilities onto the proposed bridge and <br />temporarily de -energized their power lines so the contractor could set <br />the bridge components. <br />Design <br />Construction Inspection <br />CLIENT: City of Evansville Department of Public Works & Recreation <br />PROJECT DESCRIPTION: <br />The project was completed in two phases. Phase 3 (Marchand Bridge <br />Connector) included a 10-foot-wide asphalt trail path with concrete <br />edgings to connect the main trail path just north of Ohio Street to the <br />Marchand Bridge Overlook. The construction for this phase included" <br />the trail path, trail lighting, landscaping, and fencing. Phase 6 included _ C <br />a 10-foot wide asphalt trail path with concrete edgings which began Fa <br />at the Uhlhorn Street Trailhead to the Pigeon Creek Levee and ended <br />at an overlook of Pigeon Creek near Fulton Avenue. The construction' <br />included the trail path, landscaping, connectors to Cedar Street and <br />Fulton Avenue, and MSE walls for the overlook. The Greenway Trail also <br />required the construction of more than 1,000 feet of concrete levee wall. The contractor was required to create and maintain a temporaryflood plan throughout construction in case Pigeon Creek rose to flood plor <br />levels during levee wall construction. SERVICES PROVIDED BY UNITED: <br />► Construction Inspection <br />UNITED CONSULTING 0 CITY OF SOUTH BEND ■ SAFE ROUTES TO SCHOOL AT MUESSEL PRIMARY/HOLY CROSS SCHOOL - DES #1900447 (LAPORTE DISTRICT) 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.