Laserfiche WebLink
Project Experience <br />CLIENT: City of Cicero, Indiana <br />PROJECT DESCRIPTION: <br />The project included a walkway along the Morse Reservoir/Jackson <br />Street Causeway and a safe pedestrian connection between Red Bridge <br />Park and Community Park. Shell -piles were a cost-effective solution for <br />the 21-span structure. The three main spans over the waterway utilize <br />prefabricated steel trusses while the remaining spans utilize side -by - <br />side concrete box -beams with a concrete overlay. Steel sheet piling, <br />with a concrete face, was used to tie the proposed walkway into the <br />existing topography. A major challenge for this project was coordinating <br />the construction with the existing utilities which included overhead <br />power lines parallel to the alignment of the pedestrian bridge. The <br />power utility relocated their facilities onto the proposed bridge and <br />temporarily de -energized their power lines so the contractor could set <br />the bridge components. <br />Design <br />Construction Inspection <br />CLIENT: City of Evansville Department of Public Works & Recreation <br />PROJECT DESCRIPTION: <br />The project was completed in two phases. Phase 3 (Marchand Bridge <br />Connector) included a 10-foot-wide asphalt trail path with concrete <br />edgings to connect the main trail path just north of Ohio Street to the <br />Marchand Bridge Overlook. The construction for this phase included" <br />the trail path, trail lighting, landscaping, and fencing. Phase 6 included _ C <br />a 10-foot wide asphalt trail path with concrete edgings which began Fa <br />at the Uhlhorn Street Trailhead to the Pigeon Creek Levee and ended <br />at an overlook of Pigeon Creek near Fulton Avenue. The construction' <br />included the trail path, landscaping, connectors to Cedar Street and <br />Fulton Avenue, and MSE walls for the overlook. The Greenway Trail also <br />required the construction of more than 1,000 feet of concrete levee wall. The contractor was required to create and maintain a temporaryflood plan throughout construction in case Pigeon Creek rose to flood plor <br />levels during levee wall construction. SERVICES PROVIDED BY UNITED: <br />► Construction Inspection <br />UNITED CONSULTING 0 CITY OF SOUTH BEND ■ SAFE ROUTES TO SCHOOL AT MUESSEL PRIMARY/HOLY CROSS SCHOOL - DES #1900447 (LAPORTE DISTRICT) 9 <br />