My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - Apex Consulting
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - Apex Consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:08:49 PM
Creation date
11/28/2023 2:08:39 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Page | 10 <br /> <br /> <br /> CITY OF SOUTH BEND – SAFE ROUTE TO SCHOOL FOR HOLY CROSS SCHOOL AND MUESSEL SCHOOL <br /> PROJECT APPROACH <br /> <br />The project is located on the existing perimeter roads surrounding and adjacent to the school, which consists of <br />Wilber Street on the west, Vassar Avenue on the north, Allen Street on the east and Lincoln Way West on the south. <br />(see inset map on right of this page). The APEX Team has completed preliminary investigations for this Safe <br />Route to School project (Des No. 2100025) in the City of South Bend. We are moving ahead and are making <br />great strides with our research. At this early stage, the APEX Team has performed the following initial <br />investigation tasks: <br />❖ Mr. Hepler has visited, walked through, and photographed the project site to evaluate the existing conditions <br />of the existing sidewalks as well as communicating with Ms. Gemma Stanton with City of South Bend. <br />❖ Reviewed and evaluated the available data such maps and proposal. <br /> <br />Upon receiving the notice to proceed (NTP), we will coordinate with the City Officials who are involved with <br />the project, Contractor and INDOT La Porte District Area Engineer to get a mutual date for pre-construction <br />conference. APEX will coordinate and notify all parties involved during construction by sending pre- <br />construction conference notification letters. The APEX Team will organize and manage the preconstruction <br />conference. Minutes of the meeting will be prepared, and a copy will be provided to all participants. The APEX <br />inspection team will meet with the design engineer to learn more about the project and any special design <br />considerations of the project. <br /> <br />Project Management and Communication <br />Communication is most important during the Construction project. Lines of communication between all parties will <br />be established during the pre-construction conference. We plan to have a bi-weekly meeting with all parties involved <br />with the construction project. Cody will keep INDOT and the City of South Bend updated on the project status <br />during construction by providing bi-weekly progress meetings with Area Engineer, Contractor, subcontractors, and utilities involved. <br /> <br />The inspectors and project supervisor will record and maintain all documentation in accordance with the INDOT General Guidelines to Field Employee <br />and Site Manager. Material testing will be completed in accordance with INDOT Procedures. Upon completion of the project construction, preparation of <br />the project final construction records is our priority. <br /> <br />The APEX Team is committed to providing the City of South Bend with superior construction inspection services. Our goal <br />is to provide the best opportunity to have a successful project that accomplishes the following: <br />➢ Create the complete project for the city and the public. <br />➢ Provide quick responses to all parties. <br />➢ Maintain project schedules to reach the critical due dates. <br />➢ Minimize construction disputes. <br />➢ Contain project construction costs associated with delay, extra work, and rework. <br />APEX Team does their homework. <br />• Review the construction <br />plans and contract <br />documents. <br />• Check all testing equipment. <br />• Coordination with INDOT and <br />local engineer <br />SRTS <br />Project <br />Location <br /> <br />Holy Cross <br />Elem. School <br />Location <br /> <br />Muessel <br />Elem. School <br />Location <br />
The URL can be used to link to this page
Your browser does not support the video tag.