My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - Abonmarche
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Opening of Quotations/Proposals
>
Opening of Proposals - SRTS Muessel Primary & Holy Cross Proj No 122-006 - Abonmarche
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/28/2023 2:08:38 PM
Creation date
11/28/2023 2:08:30 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/28/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposal for City of South Bend - Muessel Primary/Holy Cross <br />PROJECT EXPERIENCE <br />9TH STREET MULTI-USE PATH <br />GOSHEN, INDIANA <br />This project created a multi-use path from College Avenue to Purl Street, providing improved pedestrian and bicycle access to both Goshen High School and Goshen College. Abonmarche’s role of construction inspection and administration involved ensuring the workmanship and materials were in accordance with INDOT standards. <br />CLIENT <br />City of Goshen <br />CONSTRUCTION <br />$180,000 (Construction Inspection & Administration) <br />HIGHLIGHTS <br />• Construction Inspection and Administration <br />• Client Communication Coordination <br />• Quality Assurance <br />• Public Engagement <br />EAST DIVISION STREET PHASE II <br />DEMOTTE, INDIANA <br />This second phase federal-aid LPA project included CE-1, topographic survey, route survey, a 46 parcel land acquisition, hydraulic design, utility relocations and road design for one mile of Division Street in DeMotte. This street is a major east/west corridor linking a residential area with the business district. The 18-foot road was replaced with two 11-foot lanes and 3-foot bituminous shoulders. <br />CLIENT <br />Town of Demotte <br />CONSTRUCTION <br />Phase I $700,000 <br />Phase II $1.5 million <br />HIGHLIGHTS <br />• Environmental Assessment CE-1 <br />• Topographic & Route Surveys <br />• Land Acquisition <br />• Hydraulic Design <br />• Road Design <br />• Construction Administration <br />IRON HORSE HERITAGE TRAIL <br />PORTAGE, INDIANA <br />This project was designed to improve access to the parks and create more recreational opportunities. The design features a 1,700 foot long, 12 foot wide asphalt multi-use trail with painted cross walks at Portage Avenue and Hamstrom Road. <br />CLIENT <br />City of Portage <br />CONSTRUCTION <br />$180,000 <br />HIGHLIGHTS <br />• LPA Design & Construction Engineering <br />• 1700 Linear Foot Path on Old Railroad Bed <br />• Improved ADA Accessibility <br />• Topographic Survey <br />• Comprehensive Field Investigation & Analysis <br />11
The URL can be used to link to this page
Your browser does not support the video tag.