Laserfiche WebLink
City of Peoria <br />Land Development Manager <br />City of Peoria I Community Development Department <br />Mr. Matt Smith <br />mjsmith@peoriagov.org <br />McKinley School Full Wreck— Peoria, IL $943,700.00 <br />The wreck and removal of the existing McKinly School including abatement of existing ACM's. The <br />existing school consists of concrete, brick, block, and steel construction totaling approximately 65,000 <br />sgft. This ongoing project consists of Green Demolition managing the front end of the project <br />confirming utility disconnects have been completed, monitoring environmental remediation efforts, and <br />ensuring proper site security and protection including perimeter site fencing. Approximately 75%-85% of <br />the total building debris including site concrete and asphalt paving will be recycled or re -purposed for <br />further use. This building is surrounded by a residential neighborhood requiring strict adherence to silica <br />exposure. <br />315 Brighton, LLC <br />315 Brighton Street <br />La Porte, IN 46350 <br />Janet Dommer <br />219-242-2570 <br />Industrial Building - La Porte, IN <br />$1,186,000.00 <br />Wreck and removal of selected portions of the existing industrial building that was damaged or <br />destroyed by a building fire. The existing building consists of concrete, brick, block, and steel <br />construction totaling approximately 125,000 sgft This project requires careful attention and demolition <br />expertise to ensure structurally compromised portions of the building are safely removed to avoid full <br />building collapse. <br />