Laserfiche WebLink
Multi -level project consisting of selective demolition totaling 100,000 sf of area. Worked in strict <br />adherence with municipal building security requirements. <br />Rockford Construction <br />Grand Rapids, MI 49508 <br />Brock Burgess <br />616-437-4226 <br />LaPorte, In <br />Meijer Store <br />$ 787,000.00 <br />Complete 1009/o gut/re-habilitation project of an existing big box facility consisting of ceiling, drywall <br />partitions, storefronts/facades, flooring, concrete and M.E.P. removals. Project also consisted of partial <br />building wreck. <br />Tonn & Blank Construction LLC <br />1623 Greenwood Ave. <br />Michigan City, IN 46360 <br />Joel Gonzales <br />219 877-8174 <br />Uptown Artist Lofts Michigan City, IN $ 611,086.00 <br />Interior selective demolition, abatement and structural removals in a multi -level facility. <br />Barton Malow Company <br />150 N Upper Wacker Dr #1650 <br />Chicago, IL 60606 <br />Brian Courtney <br />312-281-0821 <br />Argonne National Laboratory $ 212,000.00 <br />Argonne National Lab - Materials Engineering Building 370 <br />Building 360 Expansion <br />Wreck/removals within building 370 adjacent to an ongoing phosphorous experiment working in <br />direct conjunction with electric, communications systems, sprinkler systems, natural gas & steam <br />while performing lead and asbestos abatement. Building wreck within 10 ft of a linear accelerator <br />without service interruptions to the electric, water sewer natural gas, steam or comm. systems. <br />