Laserfiche WebLink
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of pages, referred to <br />in and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A.Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1.A Lump Sum amount of $228,460 based on the following estimated distribution of <br />compensation: <br />$13,270 <br />$42,740 <br />$96,700 <br />$31,790 <br />$12,000 <br />$15,730 <br />$6,420 <br />$6,540 <br />$1,270 <br />a.Schematic Plans <br />b.30% Preliminary Design Plans <br />c.60% Preliminary Design Plans <br />d.90% Final Design Plans <br />e.100% Final Design Plans <br />f.Subconsultants – Lighting & Geotechnical <br />g.Bidding and Negotiating Phase <br />h.Construction Phase <br />i.Public Information Meetings <br />j.Reimbursable Expenses $2,000 <br />2.Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner.