My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Marion Street Pedestrian Bridge Proj No. 123-060 – Lochmueller Group, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Marion Street Pedestrian Bridge Proj No. 123-060 – Lochmueller Group, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:23:00 PM
Creation date
11/14/2023 2:22:32 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 3 <br />Exhibit C – Compensation Packet BC-4: Basic Services (other than RPR) – Direct Labor Costs Times a Factor Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />This is EXHIBIT C, consisting of pages, referred <br />to in and part of the Agreement between Owner and <br />Engineer for Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-4: Basic Services – Direct Labor Costs Times a Factor <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Direct Labor <br />Costs Times a Factor Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. An amount equal to Engineer’s Direct Labor Costs times a factor of for the services <br />of Engineer’s personnel engaged on the Project, plus Reimbursable Expenses, estimated to <br />be $__________________, and Engineer’s Consultant’s charges, if any, estimated to be <br />$__________________. <br />2. Engineer’s Reimbursable Expenses Schedule is attached to this Exhibit C as Appendix 1. <br />3. The total compensation for services under Paragraph C2.01 is estimated to be <br />$__________________ based on the following distribution of compensation: <br />a. Study and Report Phase $______________________ <br />b. Preliminary Design Phase $______________________ <br />c. Final Design Phase $______________________ <br />d. Bidding or Negotiating Phase $______________________ <br />e. Construction Phase $______________________ <br />f. Post-Construction Phase $______________________ <br /> <br />4. Engineer may alter the distribution of compensation between individual phases of the work <br />noted herein to be consistent with services actually rendered, but shall not exceed the total <br />estimated compensation amount unless approved in writing by Owner. See C2.03.C.2 <br />below. <br />5. The total estimated compensation for Engineer’s services included in the breakdown by <br />phases as noted in Paragraph C2.01.A.3, incorporates all labor, overhead, profit, <br />Reimbursable Expenses, and Engineer’s Consultant’s charges.
The URL can be used to link to this page
Your browser does not support the video tag.