Laserfiche WebLink
<br /> Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Met hod of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br /> <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated , . <br /> <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br /> <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br /> <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br /> <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br /> <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, except for services of <br />Engineer’s Resident Project Representative, if any, as follows: <br />1. A Lump Sum amount of $97,000.00 based on the following estimated distribution of <br />compensation: <br />a. Study and Report Phase $ <br />b. Preliminary Design Phase $ <br />c. Final Design Phase $ <br />d. Bidding and Negotiating Phase $ <br />e. Construction Phase $ <br />f. Post-Construction Phase $ <br />a. Topographic Survey and Location Control Route Survey .............................. $28,300.00 <br />b. Alternatives Analysis (Bridge) ........................................................................ $26,500.00 <br />c. Alternatives Analysis (Roadway) .................................................................... $15,600.00 <br />d. Hydraulics and Scour Analysis ........................................................................ $18,900.00 <br />e. Project Management ........................................................................................... $7,700.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner.