Laserfiche WebLink
<br /> Page 15 <br />(Exhibit A – Engineer’s Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />22. Assistance to Owner in training Owner’s staff to operate and maintain Project equipment <br />and systems. <br />23. Assistance to Owner in developing procedures for (a) control of the operation and <br />maintenance of Project equipment and systems, and (b) related record-keeping. <br />24. Overtime work requiring higher than regular rates. <br />25. Other services performed or furnished by Engineer not otherwise provided for in this <br />Agreement. <br />A2.02 Additional Services Not Requiring Owner’s Written Authorization <br />A. Engineer shall advise Owner in advance that Engineer is will immediately commence to perform <br />or furnish the Additional Services of the types listed below. For such Additional Services, the <br />Engineer need not request or obtain specific advance written authorization from Owner. <br />Engineer shall cease performing or furnishing such Additional Services upon receipt of written <br />notice from Owner. <br />1. Services in connection with work change directives and change orders to reflect changes <br />requested by Owner. <br />2. Services in making revisions to Drawings and Specifications occasioned by the <br />acceptance of substitute materials or equipment other than “or-equal” items; services <br />after the award of the Construction Contract in evaluating and determining the <br />acceptability of a proposed "or equal" or substitution which is found to be inappropriate <br />for the Project; evaluation and determination of an excessive number of proposed "or <br />equals" or substitutions, whether proposed before or after award of the Construction <br />Contract. <br />3. Services resulting from significant delays, changes, or price increases occurring as a <br />direct or indirect result of materials, equipment, or energy shortages. <br />4. Additional or extended services during construction made necessary by (1) emergencies <br />or acts of God endangering the Work (advance notice not required), (2) the presence at <br />the Site of any Constituent of Concern or items of historical or cultural significance, (3) <br />Work damaged by fire or other cause during construction, (4) a significant amount of <br />defective, neglected, or delayed work by Contractor, (5) acceleration of the progress <br />schedule involving services beyond normal working hours, or (6) default by Contractor. <br />5. Services (other than Basic Services during the Post-Construction Phase) in connection <br />with any partial utilization of any part of the Work by Owner prior to Substantial <br />Completion. <br />6. Evaluating an unreasonable claim or an excessive number of claims submitted by <br />Contractor or others in connection with the Work.