My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Century Center Master Planning - Ratio Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Century Center Master Planning - Ratio Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:21:51 PM
Creation date
11/14/2023 2:21:38 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Page 3 <br />(Exhibit A – Architects’s Services) <br />EJCDC E-500 Agreement Between Owner and Architect for Professional Services <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br /> <br />An overall budget has not been established for the complete repostitioning of the Century Center and the <br />connected assets. However, there is an amount of $10M - $15M available for an initial phase of improvements to <br />the Century Center. The Master Plan will identify an initial phase of the project to utilize these dollars. <br /> <br />DESIGN SERVICES <br /> <br />RATIO, in conjunction with our specialty consultants, will provide Master Planning services for the identified <br />Project Scope. Following up on the City’s request to expand the Master Planning effort to include some financial <br />analysis and museum expertise, we have included as a part of our design team HVS, a convention, sports, and <br />entertainment facilities planning consultant, and Lord Cultural Resources, a museum specialist. These specialists <br />will bring a more holistic approach to the effort as the impacts of potential modifications / improvements to the <br />Century Center and the other connected assets are considered. <br /> <br />RATIO previously completed two studies of the Century Center looking at two different approaches to expand the <br />facility. These studies will provide general background information for use during this Master Planning effort. The <br />previous studies did not investigate the connected facilities or these larger financial questions. <br /> <br />The physical Master Planning services provided by RATIO will include: <br /> <br /> Assess the current uses of the Primary Buildings in the Study Area <br /> Evaluate the compatabilty of the current uses within the Century Center <br /> Assess the existing physical condition of the Century Center and Primary Buidings <br /> Prepare a narrative report with photographs describing the existing physical condition of the Century <br />Center and Primary Buildings <br /> Create list of possible uses for the Century Center and the Primary Buildings <br /> Develop two to three concept Master Plans of the Study Area depicting proposed uses for the Century <br />Center and the Primary Buildings. <br /> Review concept Master Plans with the City and identify recommended concept Master Plan <br /> Advance the selected concept Master Plan to a completion level. This will include: <br />o An illustrative site plan of the Study Area <br />o Diagrammatic floor plans of the Century Center and Primary Buildings <br />o Character renderings showing key components of the Master Plan: <br />o Two (2) exterior and three (3) interior images <br />o Compile the findings / images into a electronic and printable Master Plan document <br /> <br />The consulting services to be provided by HVS will explore redevelopment options for the Century Center as well <br />as conducting a hotel market analysis of South Bend. The consulting services to be provided by Lord Cultural
The URL can be used to link to this page
Your browser does not support the video tag.