Laserfiche WebLink
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated October , 2023. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, as follows: <br />1. Unless otherwise noted, the Owner shall pay the Engineer on a Lump Sum basis, an <br />amount of $65,000.00 based on the following estimated distribution of compensation: <br />Item Description Amount Type <br />A1.01 Project Management $3,300.00 Lump Sum <br />A1.02 Site Assessment $10,500.00 Lump Sum <br />A1.03 Conceptual Planning $42,300.00 Lump Sum <br />A1.04 Opinion of Probable Cost $8,900.00 Lump Sum <br />Total, Not To Exceed $65,000.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The amount includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the not to exceed to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period. <br />5. The portion of the Hourly Rate items billed for Engineer’s services will be based upon the <br />hourly rates provided in Exhibit C, Appendix 1, for the actual hours spent.