My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Byers Softball Complex Renovation - DLZ Indiana LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
PSA - Byers Softball Complex Renovation - DLZ Indiana LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:21:38 PM
Creation date
11/14/2023 2:21:20 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 <br />Exhibit C –Compensation Packet BC-1: Basic Services (other than RPR) – Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />SUGGESTED FORMAT <br />(for use with E-500, 2008 Edition) <br />This is EXHIBIT C, consisting of 2 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated October , 2023. <br />Payments to Engineer for Services and Reimbursable Expenses <br />COMPENSATION PACKET BC-1: Basic Services – Lump Sum <br />Article 2 of the Agreement is supplemented to include the following agreement of the parties: <br />ARTICLE 2 – OWNER’S RESPONSIBILITIES <br />C2.01 Compensation for Basic Services (other than Resident Project Representative) – Lump Sum <br />Method of Payment <br />A. Owner shall pay Engineer for Basic Services set forth in Exhibit A, as follows: <br />1. Unless otherwise noted, the Owner shall pay the Engineer on a Lump Sum basis, an <br />amount of $65,000.00 based on the following estimated distribution of compensation: <br />Item Description Amount Type <br />A1.01 Project Management $3,300.00 Lump Sum <br />A1.02 Site Assessment $10,500.00 Lump Sum <br />A1.03 Conceptual Planning $42,300.00 Lump Sum <br />A1.04 Opinion of Probable Cost $8,900.00 Lump Sum <br />Total, Not To Exceed $65,000.00 <br />2. Engineer may alter the distribution of compensation between individual phases noted <br />herein to be consistent with services actually rendered, but shall not exceed the total Lump <br />Sum amount unless approved in writing by the Owner. <br />3. The amount includes compensation for Engineer’s services and services of Engineer’s <br />Consultants, if any. Appropriate amounts have been incorporated in the not to exceed to <br />account for labor, overhead, profit, and Reimbursable Expenses. <br />4. The portion of the Lump Sum amount billed for Engineer’s services will be based upon <br />Engineer’s estimate of the percentage of the total services actually completed during the <br />billing period. <br />5. The portion of the Hourly Rate items billed for Engineer’s services will be based upon the <br />hourly rates provided in Exhibit C, Appendix 1, for the actual hours spent.
The URL can be used to link to this page
Your browser does not support the video tag.