Laserfiche WebLink
AMERICAN STRUCTUREPOINT, INC. <br />MANHOUR JUSTIFICATION - FINAL DESIGN PHASE <br />PROJECT: Seitz Park Retaining Wall Study & Design <br />Scope of Work: South Bend Dam East Abutment Rehabilitation - Amendment #3 <br />10/17/2023 <br />ESTIMATED TIME <br />WORK CLASSIFICATION TOTAL <br />Out of Scope Work <br />Preparation of Bid Documents 8 8 12 12 <br />Specifications 8 8 4 <br />Cost Estimates 4 8 4 <br />Value Engineering 16 12 20 8 <br />Seitz Park Meetings 4 <br />Contractor Bid Meetings 8 4 4 <br />Weekly Reports to FERC 4 <br />Wall Inspections during Construction 8 8 <br />Shop Drawing Reviews 4 8 <br />Respond to Contr Questions 8 8 <br />Proposed Scope of Work <br />Construction Progress Meetings 4 <br />Respond to Contr Questions 2 4 <br />Inspection of Wall during Construction 6 6 <br />Review Stability Analysis 4 8 <br />Weekly Reports to FERC 8 <br />Final Construction Report to FERC 4 8 <br />TOTAL HOURS 100 40 94 0 20 <br />Hourly Rates 250.00$        155.00$        165.00$        210.00$       105.00$      <br />SALARY COST 25,000.00$  6,200.00$     15,510.00$   ‐$              2,100.00$  48,810.00$    <br />DIRECT COSTS $0.00 <br />TOTAL FEE 48,900.00$ <br />Direct Costs Unit Cost Quantity Cost <br />Mileage 0.39$ 0 $0.00 <br />Meals 15.00$ 0 $0.00 <br />Sub-Consultant $0.00 <br />Total $0.00 <br />Project <br />Manager <br />Project <br />Engineer Designer <br />Senior <br />Designer Technician <br />DocuSign Envelope ID: 04B69E2E-25A4-4B92-9F70-91C69F1F59D3