My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment No 2 to OEA - Morris Performing Arts Center Expansion - Ratio Design
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2023
>
Agreements/Contracts/Proposals/Addenda
>
Amendment No 2 to OEA - Morris Performing Arts Center Expansion - Ratio Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2023 2:21:11 PM
Creation date
11/14/2023 2:21:07 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/14/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 31, 2023 Patrick Sherman, PMP, DASM Project Manager / Division of Engineering City of South Bend 227 W. Jefferson Blvd., Ste. 1316 South Bend, Indiana 46601 Re: Morris PAC Renovation, Final Design Phase Amendment Dear Patrick, As we have completed our Final Design Phase scope of services, we have the following Amendment to make to our current Project Scope and Fee as previously directed by the City for completing the Final Design Phase. ADDITIONAL PROJECT SCOPE Item 1: Provide an Alternate Bid to delete the VIP Lounge and adjacent Balcony. Produce additional documents as needed to include enlarging the Second Floor Lobby Space into the VIP Lounge and Balcony Space (the balcony becomes interior space with the exterior wall aligning with the adjacent façade). Item 2: Modify the Documents so that the project can be bid as two Bid Scopes: Bid Scope 1: The Addition, Renovation, Surface Parking Lot and Plaza work only associated with the Addition. Bid Scope 2: Site Improvements for the new designed Plaza and associated work. ADDITIONAL FEE AMOUNT Basic Services: Architecture: Design Architect RATIO $ 12,000.00 Executive Architect Shive-Hattery $ 34,000.00 Structural Engineering: Structurepoint $ 5,800.00 MEP Engineering Introba $ 16,000.00 Management RATIO $ 2,000.00 Sub-Total $ 69,800.00
The URL can be used to link to this page
Your browser does not support the video tag.